Laserfiche WebLink
Master Plan. A review of the plans shows that the proposal conforms to all the requirements of the <br />RC District, except in one area. Units are required to be 15 feet from any open space or setback. <br />Units 1, 2 and 3 do not meet this setback but the commission can allow flexibility from the <br />provision using section 1136.07d. <br />The Residential Cluster District regulations require the Commission furnish a detailed report of <br />findings and recommendations to City Council. The Commissions report should find that either <br />the site plan complies with the regulations, standards, and criteria prescribed by the Zoning Code <br />for residential cluster development, or a finding of any failure of such compliance and a <br />recommendation that the site plan be approved, disapproved or modified. <br />Mr. Conway said not all of the individual driveways meet the 16 foot width requirement because <br />they turn into a side load garage. However the commission can grant relief from the requirement <br />in accordance with the cluster chapter. <br />Mr. Collins said engineering memo ofNovember 7, 2007 still applied to the project. He continues <br />to work with Mr. Zwick to ensure that all storm water management requirements are met prior to <br />building permits being issued. TMS Engineers looked to see if decelerating or turning lanes were <br />required either in the east or west bound lanes but found that neither was warranted. The <br />engineering department concurs with both TMS Engineers reports of 10/16/07 and 1/2/08. The <br />main drive entrance off of Butternut Ridge road still encroaches over the eastern property line and <br />should be shifted west 5 or 6 feet to eliminate the radius encroachment. A subdivision plat needs <br />to be submitted for approval and the plat is required showing all parcel lines, egress/ingress, utility <br />easements, setbaclc and conservation easements which should include verbiage explaining each <br />easement. The homeowner's agreement/bylaws are also required. <br />Mr. O'Malley advised the commission of their duty under the City Charter. The matter before the <br />commission is a rezoning matter which is legislative and includes a development plan. The land <br />has yet to be rezoned, although both the development and rezoning are being addressed <br />simultaneously in accordance to the residential cluster district requirements. He encouraged the <br />commission to review the development as it relates to the 2005 Master Plan. Off site traffic <br />concerns, utilities, electric, storm, gas, or sanitary are issues that may be discussed by the <br />commission, but are under the jurisdiction of the city engineer. He requested the association <br />bylaws/regulations and deed restrictions be submitted to the law department for review. <br />Receiving these prior to approval will ensure that proper notification is given that the street is a <br />private street and the city does not maintain nor provide certain governmental services. <br />Mr. Lasko reviewed the commission's previous motion requesting a report from the engineer <br />regarding the storm and sanitary lines, deed restrictions, easements submitted, information <br />regarding impact on the septic and sanitary lines down Columbia Road and a detailed traffic <br />study. He requested the city engineer provide the commission a copy of the traffic studies <br />submitted by TMS Engineers. He questioned if the plans before the commission reflect a 40-foot <br />wide easement to the city for future sanitary sewer crossings through the property. Mr. Collins <br />said it was up to the commission to require the 40 foot easement and the issue to provide sanitary <br />sewer service or leave it unsewered is still undecided. <br />2