My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/09/2009 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
2009
>
2009 Planning and Design Commission
>
12/09/2009 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:47:16 PM
Creation date
1/25/2019 6:44:03 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
2009
Board Name
Planning & Design Commission
Document Name
Minutes
Date
12/9/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Open Space Recommendations <br />• Improve the green space arca north of Springvale Golf Course to aeau a park <br />azea used for passive recreation. <br />• Devdop a Trailhead Pazk at the urminus of the bikc path at the southwcst <br />comu of the Grrat Northem Boulevard/Country Club Boulcvard <br />intersection, which will scrve as a visual gateway to thc Ciry and also provide <br />azneniries for bike path users. <br />• Utilize gtan space and other open azeas in the commercial ccncer to hold <br />acuvities such as art shows, farmers' mazketc, outdoor moviu, conccrts, and <br />special evcnts. <br />• Coordinatc public unprovunents to the Buttcrnut Ridge Cemctery with the <br />recommendauons of this plan. <br />• Resolve the disconnecrion between the Recreation Cenur, residenrial <br />neighborhoods, and othu major points of datination within thc Ciry. <br />Evaluate opuons for creating birycle and pedesuian linkaga to the <br />Recreation Centec Evaluatc altematc locations with greatcr accessibility for <br />re«earion facilidos in the future. <br />3.02 Prioritizatlon, cost estimates and potential fundfng sources <br />The following chart organizes the recommended studies and capital <br />unprovunents contained within this plan and assigns a time frame for <br />completion, develops a rough cost estimaee, and identifies potartial funding <br />souras. <br />26 1 The Great Northem Multi Modal Transportation Plan
The URL can be used to link to this page
Your browser does not support the video tag.