My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/10/2009 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
2009
>
2009 Planning and Design Commission
>
06/10/2009 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:47:19 PM
Creation date
1/25/2019 6:48:07 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
2009
Board Name
Planning & Design Commission
Document Name
Minutes
Date
6/10/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
medium wind energy system is five acres. The exhibit shows each of the parcels projected to be <br />included within the overlay district. <br />Mr. O'Malley said zoning districts are usually bound to geographical areas of which residential <br />is the largest within the city. An overlay district is a floating zoning which can encompass the <br />entire city, lies on top of other zoning districts and pinpoints specific parcels such as listed in the <br />exhibit. Mr. Malone questioned the parcels included in the overlay and said some appeared to be <br />residential. Ms. Wenger explained that poor photocopying created shading on the map, and the <br />residential lots are not included in the overlay district. Ms. Meredith questioned if there were 5 <br />acre plus parcels within the city which were not included in the overlay district but would be <br />allowed a medium WECS. Ms. Wenger said that if a property owner wished to be included in <br />the overlay district in the future, they would have to request a rezoning and be reviewed in the <br />same manner as the original overlay district. <br />Ms. Csornok asked whether or not the Metroparks land which abuts Fire Station 2 was included <br />in the overlay district. Ms. Wenger said the only Metroparks parcel included is the property on <br />which the Fire Station's access drive is located. Ms. Leek said that she is concerned that many <br />of the lots listed in the overlay district were along Butternut Ridge Road. With the number of <br />public lots along Butternut Ridge the area could become a wind farm. Ms. Wenger said there <br />would be no wind farms in North Olmsted nor does the ordinance target a specific street or <br />neighborhood. The reason public property was included within the overlay district was because <br />public buildings can benefit from the electricity generated by the systems. In identifying parcels <br />to be included in the overlay district, the size of the lot and the location of a structure which <br />would benefit from the use of a WECS were considered. Ms. Leek felt that the potential for <br />Butternut Ridge Road to look like a windmill farm was evident due to the number of lots listed in <br />the overlay district. If the city has not had feasibility studies for each property listed in the <br />overlay district isn't the city spending public time and money discussing something which is not <br />feasible? Ms. Meredith believed that the city paying to conduct wind surveys would be a larger <br />burden on the tax payers. Ms. Leek suggested requiring the manufacturer to conduct feasibility <br />studies. Ms. Wenger advised that if the city looked to invest in a WECS she would recommend a <br />study be conducted; however she would not recommend the city become regulators to property <br />owners wishing to install WECS, nor does she recommend requiring documentation showing a <br />wind study has been conducted. Mr. Rerko said the size of the unit being installed is a factor <br />required to complete a feasibility study. The payback for a unit is based on the wind velocity <br />and how much energy it will generate. Each lot's microclimate is different and depending on the <br />size of the fan or compulsion system of the unit it changes the study parameters for each lot. <br />Mr. Stalter asked if there was any thought given to including commercial lots when creating the <br />overlay district. Ms. Wenger said that depending on the size of the lot an owner can install a <br />small unit or a building integrated system. The only WECS which would not be permitted on <br />commercial would be a medium size WECS. Mr. Rerko noted that due to the size of most - <br />existing commercial lots including its building layout, setbacks and parking field, most lots could <br />only meet the requirements for building integrated systems. <br />Mr. Young said he would like to see the 1,000 foot notice requirement increased. He abuts the <br />Industrial Parkway and many of the parcels listed as light industry are residential and zoned <br />10
The URL can be used to link to this page
Your browser does not support the video tag.