Laserfiche WebLink
r,a` •. y <br />, . , •r?,r.?.? ?? <br />V. NEW BUSINESS: <br />A) Schirmer Construction, 31350 Industrial Parkway. <br />Proposal to construct office/warehouse which will include covered storage, a recessed truck dock, <br />a shed, and lot renovations. Refenal to board of zoning appeals required for variances. Heard by <br />Planning commission March 24, 1998. <br />Tim Youngmen, Fred Schirmer, and Tony Cerny, who presented the proposal to build an office <br />warehouse. This warehouse will include general offices, and store equipment. The office area <br />will be an all masonry structure with a combination of split face block which will be dark in color, <br />and a varnished block that has a smooth ground face and a more polished finish. The split face <br />block will continue around the building. Mr. Yager asked if the color being inset will be flush <br />with the split face. Mr. Cerny stated yes but only slightly. The steel siding is a light bronze color, <br />(Morton premium 70 paint) which will bring color into the building which is interstate blue. The <br />aluminum framing for the window's will match the interstate blue color. The storage shed in the <br />north west corner of the property will mimic the colors of the warehouse. Mr. Liggett asked if <br />the glazing in the windows would be clear or.incorporate color, and suggested a blue tint would <br />look very good. Mr. Cerny stated we are looking into a tint for the windows. Mr. Schirmer <br />advised we have worked very hard to be sensitive to everyone around us, CEI has a 250 ft. <br />easement that runs all the way across the back north side of our lot, and we are also going to <br />mound the landscaping along the back of the property. Mr. Zergott noted a key was not included <br />with the plans. Mr. Cerny stated the plants are only listed on the drawings. Mr. Zergott <br />commented, although I see you are working very hard to do a good job, I would still like to see a <br />key. Mr. Zergott asked if roof top units were being used. Mr. Youngman answered no the air <br />conditioning units will be placed behind the mezzanine. Mr. Zergott inquired about the <br />dumpsters, and asked if a construction company would be picking them up. Mr. Youngman <br />stated there is a brick structure and it will be covered, and out of site. Mr. Yager asked to see <br />more landscaping in the South front of the building and for it to be included with the keys as <br />noted earlier. <br />M. Yager motioned to accept the plans as written with the exceptions of 1. A revised landscaping <br />plan be submitted which shows cases and highlights the parking area towazds the cul de-cak with <br />a key, and a consideration to tinting the windows be made. The motion was seconded by B. <br />Zergott and unauimously approved. Note: In the framing of the motion it was determined that 2 <br />updated landscape drawings would be needed which should indicate plant sizes, along with an <br />updated drawing showing the revised elevations. <br />B) Ascension Lutheran Church, 28081 Lorain Road <br />Proposal to construct build.ing addition phase 1 only. Heard by plauning covimission March 10, <br />1998 and Apri114, 1998. Heard by board of zoning appeals March 26, 1998. <br />Sue Kopko, Mr. Mongello, Mr. Moyer, and Mr. Dillon were present to represent Ascension <br />' Lutheran church. Ms. Kopko presented snap shots for board members to review the grounds and <br />existiug bu.ildings. There are three different brick colors being used, the color for phase one is <br />modtsm (a shade of red), it will not match the existing bu.ilding, but will match the church located