Laserfiche WebLink
<br />Commission Meeting <br />November 8, 1999 <br />Page 2 <br /> <br /> <br />Mr. Morgan stated that the Recreation Center has a video and slides that really leave us in a <br />good light on the city channel. Next month we hope to look at possibly doing dasher board sales. <br /> <br />Mr. Morgan stated that he was approached by a company called Global Enterprises, which does <br />ice arena to dasher board advertising, and will present those ideas next month. <br /> <br />Tom Jenkins indicated that we had much greater intentions in 1999 as far as capital <br />improvement projects. Some had to be cut and are indicated on a spreadsheet. Mr. Jenkins <br />met with Mr. Stein and discussed capital improvements. Mr. Jenkins also talked about pulling <br />some money together to do some projects. Mr. Jenkins stated that we would just make our <br />budget this year, juggling to balance. Mr. Jenkins indicated that we are at a crossroads in <br />Recreation and have some construction problems. <br /> <br />Plans for more capital improvements for the ice arena are scheduled to take place this summer. <br />A new sound system will replace original equipment, which is now 25 years old. The cost of the <br />new system will be $37,000. New rubber flooring will replace aging and worn out flooring which <br />is over 20 years old. This will brighten up the entire warming area and will provide a clean fresh <br />look for rink patrons. This project will cost $74,000 and will also correct a safety problem of trip <br />hazards that the current deteriorating rubber flooring presents. Event lighting is also being <br />considered to bring back interest in public skates and boost attendance. Proposals ranging from <br />$20,000 to $30,000 have been presented to the Engineering Department for review. <br /> <br />The capital improvement package will include monies to facilitate an engineering study to look at <br />updating the Recreation Complex and includes some improvements to our Parks. This <br />comprehensive plan will look at costs to address the following items: the tennis roof, tennis <br />lighting, the gymnasium roof, the lobby roof, hockey locker rooms, tuck pointing the exterior <br />cement block, outdoor pool renovation (including a zero depth pool with water attractions and a <br />water slide), rest rooms at Clague Park and HVAC upgrades. <br /> <br />Finance Director Carrie Copfer has indicated we are permitted to borrow up to 20 years on our <br />existing levy. The maximum we would be allowed to borrow would be $1.2 million. <br /> <br />Once the engineering study comes in with price tags on all of the different improvements we will <br />prioritize all projects and make decisions based on needs and costs. It is unlikely we will be able <br />to address all of our needs. Decisions will be made once costs have been established. <br /> <br />This month’s revenue reports were reviewed, and the ice rink is up about $15,000. Mr. Morgan <br />indicated that it was just a case of a hockey club paying their bill on time this year. Gymnastics <br />should be up a bit with exercise being down. Some of the programs were changed from exercise <br />to gymnastics. <br /> <br />This year will be a boom year in team sales. Typically we receive $11,000 in jersey sales from <br />the N.O. Hockey Club. These are house league hockey jerseys, which are replaced each year <br />on an annual basis. <br /> <br />This year the Club will also replace home/away sets of hockey jerseys for their travel teams. <br />These jerseys are only purchased every 4 to 5 years as needed. This will generate an additional <br />$20,000 in the TEAM SALES line item, bringing the total to over $30,000 for the year. 1999 will <br />Commission Meeting <br />November 8, 1999 <br /> <br />