Laserfiche WebLink
<br /> <br />very busy day with lots of activities going on for the kids and to keep in mind that the big <br />th <br />registration is held on the first weekend in May. This year the registration will be held May 5. <br /> <br />The spring/summer brochure is currently at PM Graphics for printing. PM Graphics was awarded <br />the contract due to their low bid. PM Graphics is able to save approximately 15% on printing <br />costs due to the fact that they use paper on rolls and cut their own paper. It is expected that they <br />will do a fine job for the Rec Center, as they have done this for us in the past as well. <br /> <br />Mr. Morgan ran through a list of upcoming special events: <br />th <br />? <br /> <br />Annual Fishing Derby – May 13 <br />th <br />? <br /> <br />Hot Stove Opening Day – May 19 <br />th <br />? <br /> <br />Skate Park Dedication – My 12 (It was noted by Mr. Morgan that the cement work is now <br />complete.) <br /> <br />Mr. Morgan then spoke on capital improvements. <br /> <br />The rink sound system and event lighting is now in place. We had a ribbon cutting ceremony and <br />display at the Easter Open House. It was enjoyed by all. <br /> <br />Diamond #2 at North Olmsted Park is near completion. [Mrs. Hayes inquired if this was the new <br />high school varsity field.] Mr. Morgan said that it is not. It is in fact the girls’ varsity field. The <br />boys’ varsity field is Diamond #1. Improvements have been made to the backstops and sideline <br />fencing. Mr. Tom Stein will be painting the backstop to finish up the work on Diamond #1. <br /> <br />Lockers for the rink have gone out to bid. Mr. Morgan stated that in a conversation with Mr. <br />Paul Deichmann, the City Engineer, it was said that American Locker was the only bidder. It was <br />noted by Mr. Jenkins that this bid has been approved by the Board of Control. Mr. Deichmann is <br />currently working on bids for the lobby HVAC and canopy roof improvements, as well as the <br />tennis roof coating project bid. [Mrs. Hayes inquired as to when installation of the lockers will <br />take place.] Mr. Morgan responded by saying that installation will occur over the summer <br />months. It was also noted by Mr. Morgan that the Mondo floor in the rink warming area is set <br />for June installation. <br /> <br />Other improvements being made in-house were noted: <br />? <br /> <br />Auto flushers have been installed throughout the building, with the exception of the ladies’ <br />pool locker room which will be done shortly. <br />? <br /> <br />Auto faucets are scheduled for installation throughout the building. <br />? <br /> <br />In the ladies tennis locker room: toilet seat cover receptacles, waste receptacles, new vanity <br />mirror, 2 tennis prints, painted walls and ceiling, floor painting will be redone with an epoxy <br />paint to prevent peeling which has occurred New partitions for shower stalls and toilets are <br />being considered as well. <br />? <br /> <br />The north wall in the tennis courts has been painted and will be receiving one more coat. <br />? <br /> <br />Digital clocks have been installed and new pulleys are on order for the tennis department. <br />? <br /> <br />10 new ballasts have been ordered for the tennis courts to help alleviate some of the buzzing <br />Page 2 <br /> <br />