Laserfiche WebLink
Minutes of a Meeting of <br />The North Olmsted Parks and Recreation Commission <br />June 6, 2005 <br /> <br /> <br /> <br />APPROVAL OF MINUTES <br /> <br />Minutes of May 2005 <br /> <br />Mr. Kelley asked if the Members of the Commission read the Minutes from May 2005 and asked <br />for a Motion to approve them. Mr. Miller moved in favor; the Motion seconded by Mr. Lasko. <br />The Chairman asked all members in favor of the Minutes to signify by an aye. There being no <br />objection, the May 2005 Minutes were approved unanimously. <br /> <br />SUB COMMITTEE REPORTS <br /> <br />Collaboration between the Rec Center and School Board <br /> <br />Mr. Kelley asked Mr. Lasko if there was anything further to report on the collaboration between <br />the Rec Center and the School Board. Mr. Lasko said that nothing further transpired since last <br />month on the matter. <br /> <br />REPORT OF THE RECREATION COMMISSIONER <br /> <br />Indoor and Outdoor Pool Status <br /> <br />Mr. DiSalvo reported to the Recreation Commission that he wanted to review the status of the <br />indoor and outdoor pools. <br /> <br />As far as the indoor pool closing is concerned, it was the decision of the Mayor and Safety <br />Director to close the indoor pool until a complete inspection was conducted regarding the <br />structural integrity of the roof support beam in question. Past inspection information files could <br />not be located at City Hall in a timely manner and, therefore, the pool was ordered closed until an <br />inspection was conducted. The final inspection concluded that the roof structure of the pool is <br />structurally stable under the current anticipated design loads. The beam frames will require <br />structural reinforcement before the next winter season. The Mayor, Safety Director, and City <br />Council members have received this information as well. <br /> <br />Ms. Jones asked what difference it made in the swimming lessons. Mr. DiSalvo said that there <br />was a 13-day delay. Everything was prorated and rescheduled. <br /> <br />Regarding the outdoor pool repairs, the outdoor pool decks and gutters were beyond normal <br />annual maintenance repair. The deck and gutter had to be rebuilt. The Service Department is <br />conducting the repair work on the outdoor pool. Like every other city department, they have <br />limited staff and are working to complete the job as soon as possible. The Mayor, Safety <br />Page 2 <br /> <br />