Laserfiche WebLink
PLANNING & DESIGN COMMISSION <br />CITY OF NORTH OLMSTED <br />MINUTES OF MAY 26, 2021 <br />ROLL CALL <br />Mr. Malone called the meeting to order at 7:00 pm via online public meeting. <br />Present: Greg Malone, Humberto Olivos, Julie Nader, Dave Anderson <br />Absent: Tom Patton, Darrick Matthews, Paul Schumann <br />Staff: Planning Director Kim Lieber, Assistant Law Director Bryan O'Malley, City Engineer <br />Pietro DiFranco, Administrative Assistant Nicole Rambo -Ackerman <br />REVIEW AND CORRECTION OF MINUTES <br />Mr. Malone moved, seconded by Ms. Nader, to approve the Planning & Design <br />Commission minutes of May 12, 2021, motion passed 4-0. <br />NEW BUSINESS <br />21-18287; Weber Automotive; 28820 Lorain Road <br />Representatives: Bryan Weber, owner; Jason Biltz, Tekton Engineering <br />Ms. Lieber summarized the proposal. The property is zoned B-3 General Business District. <br />Abutting properties to the east and west are similarly zoned; the property to the north is zoned <br />One Family Residence and is occupied by Forest School. The proposal involves adding a new <br />8,640 square foot storage building to the existing vehicle repair facility. The new building will <br />provide climate controlled storage and a space to service older and collector cars. About half of <br />the space will be used for storage and half for service. There will be no body work, no painting <br />and no customer traffic in the building. Vehicle repair establishments are a conditional use in the <br />B-3 District; therefore, a conditional use permit is required for any expansion on the site. The <br />project must meet the specific conditional use standards for vehicle repair. All are met or not <br />applicable with the exception of the building setback from a residential district; 75 feet is <br />required and just under 30 feet is shown. Only the Planning & Design Commission and City <br />Council can waive this requirement. The building itself is primarily comprised of metal siding <br />and metal roofing. The main entrance has a decorative overhang of vinyl shake shingles, Azek <br />posts with stone bases. Overhead doors are located on the south and west elevations. The BZBA <br />granted variances for side yard setback, as pavement is encroaching in the west side yard of the <br />property and the AC unit is encroaching on the east side yard. The new pavement area will be a <br />combination of standard concrete and pervious concrete in order for the project to not exceed <br />impervious surface maximums. Curbing is shown around the perimeter, as required. A new six- <br />foot high wood fence is proposed along the rear half of the east property line. The existing trash <br />enclosure will be removed and a new PVC woodgrain enclosure constructed. Existing vegetation <br />will be removed to the north of the building to accommodate stormwater management. New <br />landscaping is proposed in the required buffer zone between the bioretention area and the north <br />property line. Some additional landscaping is near the building's front entrance. No planting <br />detail is provided for the bioretention area itself though Sheet C-204 references detail provided in <br />