Laserfiche WebLink
Finally, commissioners asked how enforcement would apply to existing tenants versus new <br /> applicants.Both Director Upton and the Director of Law confirmed that existing tenants would <br /> be handled with a soft, cooperative approach emphasizing compliance rather than penalties, <br /> while all new applicants would be required to follow the updated process immediately. <br /> Mr.David made a motion to recommend approval to city council ORD.2025-92 <br /> Repeal Ordinance 2017-32 and Ch. 1119; seconded by Mr.D'Alessandro. <br /> Motion Passed: 5-0 <br /> 321-2025; Sommers Development Group; 25896 Butternut Ridge Rd. <br /> Director Upton reviewed the 2025 Comprehensive Plan,noting its development through <br /> extensive community input, including public meetings, surveys, and committee sessions. He <br /> explained that the proposed project aligned with the plan's goals by promoting infill <br /> development,mixed housing types, green space,and connectivity. <br /> He stated that the project met the zoning threshold for a planned development and accomplished <br /> three major objectives:preserving the historic Biddulph House,providing new housing options, <br /> and enabling infrastructure improvements along Butternut Ridge Road without raising taxes.He <br /> emphasized that the city did not own or select the developer for the property, clarifying it was a <br /> private transaction. <br /> The proposed plan included 45 fee-simple homes with HOA maintenance,reduced from earlier <br /> denser versions to allow for additional green space and a pocket park.Upton explained that the <br /> design supported compact,pedestrian-friendly development while protecting the surrounding <br /> historic district.He also addressed traffic concerns, citing a trip generation analysis that showed <br /> minimal impact.He concluded that the project represented a balanced,high-quality development <br /> consistent with the city's long-term goals. <br /> The City Engineer reported that the preliminary plan had been reviewed and noted that the <br /> project was a private development,with all roads and infrastructure to be maintained by the <br /> HOA. The plan included asphalt pavement throughout,with water and sanitary sewer <br /> connections to Butternut Ridge Road via a pump station due to the site's sloping topography. <br /> Stormwater would flow to a management basin at the rear of the property,though the outlet <br /> location was still being determined. <br /> He confirmed that traffic analysis showed approximately 30 vehicle trips during peak hours— <br /> well below the 100-trip threshold that would require a full traffic study—and concluded that no <br /> additional traffic review was necessary. <br /> The Director of Law expressed full agreement with the Development Director's comments and <br /> emphasized that this project involved a rezoning from single-family residential to a planned <br /> development district.He noted that unlike typical rezonings,this "what-you-see-is-what-you- <br /> get"process allowed detailed review at each stage, including preliminary and final plans, <br /> 2 <br />