Laserfiche WebLink
" ? - <br />- .? _ - <br />_ ?.., ? . <br />CITY OF NORTH OLMSTED <br />PLANNING COMMISSION <br />MINUTES - SEPTEMBER 25, 1984 <br />I. ROLL CALL: <br />Chairman Morgan called the meeting to order at 8:00 p.m. <br />Present: J. Burns, B. Gorris, E. Traczyk, J. Brown, and T. Morgan <br />Absent: J..Wixted. <br />Also Present: Assistant Law Director J. Dubelko, Building Commissioner E. <br />Gundy, City Engineer J. Schaller, Councilman R. Tallon, <br />and Recording.Secretary B. Oring. <br />II. REVIEW AND CORRECTION OF MINUTES: <br />J. Brown moved to approve the Minutes of September 11, 1984, as.submitted, <br />seconded by B. Gorris, and unanimously approved. <br />0 <br />III. BUILDING DEPARTMENT REQUESTS: <br />1) Landspan Corp. (A.S. Dindia), located on the north west corner of <br />Lorain Road and West 231 Street. <br />Proposal to construct retail building (strip shopping center). <br />Referred from Architectural Board of Review September 19, 1984. <br />Building Commissioner Gundy advised that the center line of the service <br />drive on.West 231 Street is approximately 60' from the center line of <br />the drive across the street. Proposal was studied in conjunction with <br />the Architectural Minutes of September 19th. Mr. Petroski, architect, <br />advised that the arch will be removed and a pylon sign will be installed; <br />landscape plan will be presented to the Architectural Board; air condi- <br />.tioning uni'ts will be moved to front of building and parapet will be <br />carried around sides and partially along the rear of building. Lorain <br />Road drive could be widened, if necessary, but moving it west would <br />not be satisfactory. Planning Commission has no problems with Lorain <br />Road drive as planned; they agreed that if drive were too wide it could <br />cause traffic problems. Fire Department report from R. Osterhouse stated <br />that arch would cause problems with their trucks, and that a fire hy- <br />drant should be installed on east parking lot island and be supplied <br />from water main on Lorain Road (not from.main on W. 231 St.). Police <br />Department report stated that growth north of West 231 St. service drive <br />must be cut back at least 20 feet to improve visibility. They do not <br />believe that this drive would c-r-e.ate a problem with drive across the <br />street. Commission would like this area to be landscaped consistant <br />with landscape plan. Engineer.Schaller stated that only sewer avail- <br />able would be north/south sewer on West 231 and that they could find no <br />inadequacies. Retention system will be required and will allow no more <br />run-off water than what exists presently. The complaints that have <br />been filed with his office would seem to indicate problems dealing with <br />overland flow and showed no inadequacy in the sewer. Mr. L. Herman and