Laserfiche WebLink
A <br />? <br />CITY OF NORTH OLMSTED <br />PLANNING COMMISSION <br />MINUTES - JUNE 10, 1982 <br />I. ROLL CALL: <br />Chairman Gorris called the meeting to order at 8:00 p.m. <br />Present: J. Burns, T.?Mo-rgan, -J--. 'P'??~? ? J. Brown, and B. <br />Gorris <br />Absent: R. Perla, J. Prokasy, and J. Roberts <br />Also Present: Assistant Law Director J. Dubelko, Building <br />Commissioner E. Gundy, Assistant City Engineer <br />D. McDermott, Councilman D. Woerple, and <br />Recording Secretary B. Oring. <br />II. REVIEW AND CORRECTION OF MINUTES: <br />On page 5, last line of first paragraph, insert aye after Brown. . <br />T. Morgan moved to approve the Minutes of May 25, 1982, as r <br />corrected, seconded by J. Brown, and unanimously approved. <br />III. BUILDING DEPARTMENT REQUESTS: <br />(1) Rad Air (J. Bird), 24260 Lorain Rd. <br />Exterior alteration <br />(In committee from May 25, 1982) <br />No representative present; heard later in meeting <br />(2). Clark Oil Co. (C. Fix), 28925 Lorain Rd. <br />Proposal to construct canopy over existing gas pumps <br />Heard by Board of Zoning Appeals June 5, 1982 <br />Mr. Fix of Clark Oil explained that the canopy will be con- <br />structed over the existing pump islands, one storage tank <br />will be added, the existing service station will be painted <br />and a facia will be added. There will be a new building sign, <br />but no sign on the canopy. The orange and white slats on the <br />existing fence will be removed. T. Morgan moved to refer the <br />Clark Oil Co. proposal to the Arehitectural Board of Review, <br />seconded by J. Burns, and unanimously approved. <br />(3) Csapo Dental Lab (Corna and Assiciates), 25710 Lorain Rd. <br />Proposal to construct Dental Laboratory. <br />Mr. S. Diaquila and Mr. Burns of Corna and Associates ex- <br />plained that the proposal approved in 1980 for an addition and <br />alteratton to the existing hoai5e hacl heen abandoned. Thc prc- <br />sent plans call for razLng• Lhe fiousc and constructl.iig a new <br />building, no dental offices are planned. The split level build- <br />ing will have a 75' front set baclc. Taelve to fourteen people