Laserfiche WebLink
City of North Olmsted <br />City Hall Entrance Revempment <br />Middough Reference No. CNO 0401 <br />November 5, 2004 <br />io IL REVISED June 28, 2005 <br />Page No. 2 <br />SCOPE OF SERVICES (Continued) <br />• Develop new color sketches for color selection of the new exterior front entry. <br />• Develop finish materials schedule. Develop boards of proposed finish materials. <br />• Develop reflected ceiling plans. <br />• Design partial height wall between the upper lobby and the Caucus room. <br />• Design cabinetry for the new Caucus /Conference Room. <br />• Design snow guards and ice melt system for the roof. <br />STR UCTURAUFOUNDATI ON <br />• Review existing blueprints and field investigate exposed and accessible existing construction. <br />• Design foundations tc support building entry addition. <br />• Design new floor, wall; and roof framing for building entry addition. <br />MECHANICAL <br />• Modify existing second floor ductwork for new office and conference room. <br />• Design ductwork for renovated first floor area. <br />• Relocate existing piping below entrance floor. <br />• Relocate existing radiant heaters and cabinet unit heaters as required. <br />ELECTRICAL <br />• It is understood that the incoming service feed and power requirements for this project are locally <br />available and of sufficient capacity to meet the project requirements. <br />• Develop options for exterior lighting and review with the City. <br />• Design the selected exterior lighting option. <br />• Modify existing second floor lighting for new office and conference room. <br />• Design lighting for renovated first floor area. <br />• Design electric snow melting system for new entrance ramps. <br />• Design power circuits to three (3) sliding entrance doors. <br />NAOrrY NORTH OLMSTED .CLE\CN00401 \00RR\CONTRACT DOCS\SCOPE OF SVCS\CNOD4D1 805 REV 1.DOC <br />