Laserfiche WebLink
b> <br />Determination of the Long Term Feasibility of <br />Transporting Unstabilized North Olmsted Biosolids to the North Royalton <br />Composting Facility <br />and <br />Composting the transported biosolids with Unstabilized North Royalton Biosolids <br />Pilot Test Plan of Study Revision-No. 1 <br />The Task 1 activities are actions to be taken by the wastewater treatment <br />operating and management staffs. The work of the two operating staffs will include <br />transporting City of North Olmsted unstabilized biosolids to the City of North Royalton <br />composting facility and stabilizing those biosolids along with the biosolids generated by <br />the two City of North Royalton wastewater treatment plants. The work of the two <br />management staffs will include reviewing the laboratory analytical data of the additional <br />stabilized biosolids volumes, selling of the additional quantities of stabilized biosolids <br />and developing a long -term economic and technical feasibility report. <br />The Task 2 activities are those needed to complete the processes required to <br />implement the conclusions of the Task 1 activities if those activities clearly <br />demonstrate the predicted long -term economic and technical feasibility of the pilot <br />tested operations. If those activities do not clearly demonstrate the predicted -long -term <br />economic and technical feasibility of the pilot tested operations, then the Task 2 activities <br />would not be performed. <br />The Task 2 activities are actions to be taken by the administrative, legislative and <br />legal officials of both municipalities. Therefore, the Task 2 activities would be <br />completed after completion of the economic and technical evaluations and reporting by <br />the wastewater treatment management staffs of both municipalities. <br />Plan of Study <br />Task Activity <br />1 -1 Concurrence of Plan of Study by both municipalities <br />1 -2 Jointly transmit Plan of Study to Ohio EPA - Northeast District Office <br />1 -3 Determine amount and solids concentration of unstabilized biosolids to <br />be transported from the North Olmsted WWTP to the North Royalton <br />composting facility during week 1 and week 2 <br />1 -4 Determine the sampling plan for the pilot testing period <br />1 -5 Develop the pilot testing log sheets .to be used by the wastewater <br />treatment operating staffs of both municipalities during the two weeks of <br />the pilot testing <br />1 -6 Negotiate the scope of work and estimated costs for the EC Labs <br />analytical laboratory work required during the two week pilot testing <br />period <br />1 -7 Issuance of a purchase order by North Olmsted to EC Labs for the <br />analytical laboratory work required during the two week pilot testing <br />period <br />1 -8 Begin transporting unstabilized biosolids from the North Olmsted <br />WWTP to the North Royalton composting facility for the first week of <br />CompostPOS -Rev Ldoc Page 4 of 6 September 6, 2001 <br />