My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-056 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2002
>
2002-056 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:03:03 PM
Creation date
12/30/2013 9:16:30 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2002-056
Legislation Date
5/21/2002
Year
2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />APPENDIX A <br />PUMP STATIONS INFLUENT CUNTROL GATES PROJECT <br />Description of Project <br />The Project consists of the professional design services for a manually operated, <br />downward closing gate that will be mounted over the influent sewer to the Dover Pump <br />Station and the influent sewer to the Lebern Pump Station. After design and installation, <br />the two gates will allow the City to control the flow rate from each influent sewer into the <br />wet well of the stations. <br />The sites intended for the influent control gates are the existing Dover Pump Station and <br />Lebern Pump Station sites. The Dover Pump Station is located at 3827 Dover Center <br />Road. The Lebern Pump Station is located at 23761 Lebern Drive.
The URL can be used to link to this page
Your browser does not support the video tag.