Laserfiche WebLink
2. Prepare a set of updated Lebern Pump Station drawings. <br />3. Prepare a drawing showing the plan view and profile view section for the design <br />of a downward closing gate mounted over the 21-inch diameter influent sewer <br />in the Dover Pump Station wet well as well as the gate stem, stem guides, <br />manua.l operator and manual operator support beams; <br />4. Prepare a drawing showing the plan view and profile view section for the design <br />of a doumward closing gate mounted over the 18-inch diameter influent sewer <br />in the Lebern Pump Station wet well as well as the gate stem, stem guides, <br />manual operator and manual operator support beams; <br />5. Prepare a modification to the Section 15000 technical specification developed <br />for the 1993 State Issue 2 WWTP Improvements - Bid Package No. 2 to reflect <br />the equipment design shown on the drawings prepared in Task Nos. 3 and 4 <br />above.