My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-056 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2002
>
2002-056 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:03:03 PM
Creation date
12/30/2013 9:16:30 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2002-056
Legislation Date
5/21/2002
Year
2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, t <br />3.1.1 Designate a CITY representative having the authority to give <br />instructions_ receive information, define the C.ITY'S policies and <br />make decisions with respect to the design af Intluent Control Gates for <br />the Dover and Lebern pump stations. <br />3.1.2 Provrde ail criteria arid information as to the CITY'S requirements for <br />the desigm Qf lnfluent Control Gates for the Dover and Lebern pump <br />stations, including design obiectives and constraints, capacity <br />requirements and budgetary limitations. <br />3.13 Furnish copres of all design and construction standards which the <br />C1TY Will require to be included in the design of lnfluent Control <br />Gates for the Dover and Lebern pump stations. <br />y.1.4 Pravide access to the pump stations as requested by the DESIGN <br />PROFESSIONAL; <br />11.5 Provide all available data, recorci drawings, sketches and information <br />in the passessron ofi the CiTY relevant to the design of Influent <br />C'ontrol C?ates fcr the Dover and Lebern pump stations. This data and <br />information inciudes: (1 ) the record drativings identified in the May <br />2001 Request for Proposal for the 1?ump Stations Influent C`<ontrol <br />Gates Prq?ject and appropriate professional interpretaY,ions thereof; and <br />(2) other necessary data and consultations. <br />SECTION 4. TIME SCHEDULE <br />4.1 Unless otherwise directed by the C'1TY, the DESTGN PRC)FFSSIONAt. <br />shall commence the performance of the Section 1.}3asic Services of the DESIGN <br />PROFESSIONAL upon execution of this Agreement by both parties and issuance of a <br />Notice to Proceed by the CITY. <br />4.2 The DESiGN PROFESSI0NAL recogmizes that the services under this <br />Agreement are to be performed as expeditiously as practical. The DESIGN <br />PROFESSIONAL shall make every reasonable effart to substantially complete the
The URL can be used to link to this page
Your browser does not support the video tag.