Laserfiche WebLink
, f <br />WI3EREAS, the installation of influent control gates wi11 ailow the Dover and <br />LeUern pump stations to continuously operate at their maximum pumping capacity during <br />all large pree.ipitation events; and <br />WHEREAS, continuous operation ofthe Dover and Lebern pump stations at their <br />malirnum pumpirig capacit_y during all large precipitation events wauld cause an overall <br />lowering of water surfiace elevation in the sanitary sewer system during and after lal'ge <br />precipitation events. <br />NnW THEREFORE, the CITY and the DESIGN PROFESSIQNAL do herehy <br />agree in respect to the performance of the services of this Agreement b_y the DESIGN <br />PROFESStQNAL and payr-nent for those services by the CiTY, as is more particularly set <br />forth below. <br />SECTlON I. BAS1C SERVICES OF THE DESIGN PROFESSIONAL <br />1.1 The services to be perfarmed under this Agreei»ent shall encompass the <br />design services required for the Pump Stations influent Control GateS. <br />1.2 The scope and details of the services are more fiill_y described in E_xhibit I <br />and Exhibit IV, Scope of Services, attached hereto and made a part hereof. <br />SECTION 2. ADDITIONAL SERVIGES OF THE DEStGN PROFESSIONAL <br />2.1 No additional services are expected to be required in carrying out the design <br />services required for the Pump Stations influent Contr-ol Gates. However, shouid any <br />additional services by the DESIGN PROFESSiONAL become necessaryr, any additianal <br />services wauld be szparate from the Sectian 1- F3asic Services of the DESIC7N <br />PROFESSIONAL and would be an Optianal Serv_ice that can be undertaken only upon <br />written authorization by the GITY. <br />SECTION 3. CITY'S RESPONSiBIL1TiES <br />1.1 The CITY shali do the foliowing in a tiinely manner: