My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-086 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2008
>
2008-086 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:05:47 PM
Creation date
12/30/2013 8:47:53 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2008-086
Legislation Date
6/3/2008
Year
2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May 20 08 05;13p <br />p. a <br />Provide six stockpile samples, two cavity samples, one line sample and two dispenser samples <br />Each sample wiil be anatyzed for TPH, BTEX and PNA (Diesel) <br />Tank cleaning and disposal at approved disposal facility <br />Refill cavity with excavated soil if clean <br />Supply #304 gravel for tanic volume <br />Compad cavity in twelve inch lifts with vibrator roiler <br />Leave site ready for City to resurface <br />Dispasal of two drums cleaning materials <br />Provide camptete tank removal that meets a115tate Fire Marshats Regulations. All phases of removal will <br />be done per BUS7R 2005 Technical Guidance Manual/Codes <br />A!I Labor <br />Conditions: <br />Owner responsible to have tank pumped down <br />Not Responsible for any underground utilities near tank system <br />Owner to resurface inside and out area <br />Disposal of contaminated soi( hauling, loading and disposa! $47.00 per ton <br />Clean fill and compaction for soil replacement $15.50 per ton <br />If water is present in taRk cav+ty will needed to be pumped vui <br />before removal or during removal .12 per gal{on <br />Vac tanker to pump cavity water $95.00 per hr <br />2.2 The Contact price shall be paid in current funds by the Owner upon payment requests issued by <br />the Contractor and approved by the Department as pravided in the Contract Dacuments. <br />2.3 The Contractor shali diligently prosecute the Work and shall effect Contract Gompletion on or <br />before 60 consecutive days, fofiowing the date set forth in the Notice to Commencement, unless <br />an extension of time is granted by the Departmeni in accardance wiih the Contract Documents. <br />2.4 1t is understvod and agreed that all Work to be performed under the Contract shall be <br />campleted within the established Contact Completion time and that each applicable portion <br />the Work shaN be completed upon the respeciive Milestone Completion Dates, until an <br />extension of time is granted by ihe Department in accordance with the Contract Documents. <br />ARTICLE 3 <br />3.1 Bureau af Workers' tornoensatiorLThe Coniractor and its employees shall be covered by <br />workers' compensation coverage purchased and maintained by the Contractor. In additton, <br />the Contractor shall ensure that any subcontraciors maintain workers' compensation insurance <br />at all times during the term of this agreement. Any workers' compensation claims filed by the <br />Contractor, or its emptoyees or subcantractors, as a result of work performed under this <br />agreement is not covered under the Departrnent's workers' campensation insurance.
The URL can be used to link to this page
Your browser does not support the video tag.