My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-108 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2000
>
2000-108 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:10:46 PM
Creation date
12/30/2013 8:11:53 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2000-108
Legislation Date
9/19/2000
Year
2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />.? <br />City of North Olmsted <br />5200 Dover Center Road <br />North Olmsted, Ohio 44070 <br />Ralph H. Bohlmann, Director Norman T. Musial, Mayor <br />Department of Public Service <br />July 12, 2000 <br />Mr. Babu Patel, P.E. <br />Polytech, Inc. <br />1744 Payne Avenue <br />Cleveland, Ohio 44114 <br />Re: Request for Proposal, Engineering Services <br />for Clague and Lorain Intersection Improvements <br />Dear Mr. Patel: <br />I am requesting a Proposal to provide professional engineering services for the Clague <br />and Lorain Intersection Improvements in the City of North Olmsted. The proposed work <br />would include the following: <br />1. Replace pavement on Clague Road from approximately 500 feet north of Lorain to <br />approximately 750 feet south of Lorain Road. <br />2. New pavement is to be a minimuxn of ten (10) inches thick reinforced concrete with <br />curb and gutters. New pavement, except at transitions to existing asphalt, is to be a <br />minimum of 28 feet wide. Northbound and southbound right turning lanes are to be <br />added. Existing left-turn lanes on Clague Road are to be lengthened. Double left-turn <br />lanes may be incorporated into the project. <br />3. Right-of-way is to be acquired for turning lanes, requiring preparation of right-of-way <br />acquisition, and possibly easements, plats, and descriptions. <br />4. Storm sewer improvements will be part of the proposed sewer work. Relocation or <br />reconstruction of a portion of a sanitary sewer force main on Clague Road at and near <br />Lorain Road is also anticipated. <br />5. Traffic signalization, signages, and pavement marking improvements are required. <br />6. New sidewalks and driveway aprons on Clague Road are to be incorporated as <br />necessary. Any water main relocation work necessitated by changes in roadway <br />elevation or sewer construction to be incorporated as necessary. <br />7. Intersection improvements on Lorain Road at or near Clague Road to be incorporated <br />as necessary. <br />? <br />Phone: (440) 777-8000 0 Fax: (440) 777-5889 <br />, „ <br />...
The URL can be used to link to this page
Your browser does not support the video tag.