Laserfiche WebLink
<br />? ? ? ? <br /> Polytech, Inc. <br /> July 26, 2000 <br /> Page 3 of 6 <br />? <br />? Based on the above unit fee schedule and estimate of overall quantities, the subsoil <br />roximatel <br />$1 <br />750 <br />00 <br />loration would involve total fees of a <br />ex <br /> pp <br />y <br />, <br />. <br />. <br />p <br /> Our estimate covers the work needed to present our findings and recommendations in a <br /> report form. Not included are reviews of foundation drawings, preparation of <br /> construction specifications, special conferences and any other work requested after <br /> submittal of our report. <br /> The above estimate has been prepared assuming that: <br /> <br /> a. Determination of location and depth of the existing utility lines will be <br /> the responsibility of others. <br /> <br /> b. Permission to enter the property will be the responsibility of others. <br /> c. Some damage to the areas traversed by the drilling equipment will be <br />- unavoidable. The extent of the damage will depend on the structural <br /> state of the surficial soils, pavements, and floor slab. PSI will not <br /> assume responsibility for any damages. <br /> d. All the test positions will be located and surveyed by the client. <br />? <br />? <br />? <br />? <br /> <br />? <br />? <br />