Laserfiche WebLink
<br />Mr. Paul W. Deichmann <br />June 30, 2000 <br />Page 4 <br />2. Additional design work required for the preparation of alternates as requested <br />by your office. <br />3. Preparation of "record" as built drawings is not included in this fee proposal. <br />4. Additional site visitations during construction and setup are not included in this <br />fee proposal, if required, would be billed separately at $85.00 per hour at <br />approximately two hours per inspection trip. <br />COMPENSATION <br />For the purpose of this project, we propose to work on an hourly basis not to exceed <br />Four Thausand Seven Hundred Dollars ($4,750.00) broken down as follows: <br />Working drawings and specifications $2,950.00 <br />Post bid services, Pre-bid meeting, Shop drawing review $800.00 <br />Construction Administration <br />Four visits during construction $1,000.00 <br />$4,750.00 <br />Should "additional services" as defined herein be requested by your office, they will <br />be billed at the following hourly rates: <br />Principal <br />Engineer <br />Designer <br />Draftsman <br />$90.00/hr. <br />585.00/hr. <br />$60.00/hr. <br />$ 50.00/hr. <br />These rates are effective through September, 2000. <br />The personnel from this office that will be working on this project will be Timothy J. <br />Norris, Robert S. Ferencik and Susan Krieger. <br />(cont.) <br />