Mr. Foster McMasters May 16, 2000 <br />Metcalf & Eddy of Ohio, Inc. Page 2 of 14 <br />centrifuge would a11ow the City to implement other biosolids disposal options quickly and <br />relatively inexpensively. Further, centrifuge off gases are easily contained thereby allowing <br />for treatment of the minimum volume of air through the existing Odor Group BiC equip- <br />ment. The treatment of off gases from any sludge dewatering process was a key selection <br />factor due to the significant cost that has been and continues to be incurred by the City in <br />treating thennal conditioning off gases and other concentrated odors generated on the <br />WWTP site. <br />Separate from these professional services procurement, the Citv will be completing the <br />public procurement process for one complete dewatering centrifuge system. After its <br />procurement, the selected system sha11 be incorporated into the work of these professional <br />services. The public procurement process for the 2000 Dewatering Centrifuge Project will <br />include the on-site pilot testing of the proposed dewatering centrifuge machines. It is the <br />intention of the City to begin and/or complete the design and constru.ction of all work <br />common to the three complete dewatezing centrifuge systems named in those specifications <br />during the on-site pilot testing work and the subsequent life cycle cost evaluation by the City. <br />Besides completing the complete dewatering centrifuge system procurement, the City will <br />be directly purchasing the other components required for the project. Several of these <br />components are shown on the Preliminary Sludge Loadout Building (SLB) Layout that is <br />Attachment 1 to this letter. After their procurement, these components sha11 be incorporated <br />into the work of these professional services. These direct purchases will include the spiral <br />stairs, the sludge cake conveyor, the sludge cake feed pump, the centrifuge sludge feed line <br />flow meter, the polymer storage tanks, a 2 ton maintenance gantry, the electrical distribution <br />system equipment and the I&C equipment. It is the intention of the City to begin and/or <br />complete each purchase as soon as the technical requirements of that purchase are known. <br />The design of the electrical distribution equipment, the Instrumentation and Control (I&C) <br />equipment and their conduits and conductors/wiring will be done by electrical distribution <br />and I&C specialists retained separately by the City. After completion of these efforts, these <br />efforts shall be incorporated into the work of these professional services. These specialists <br />have been and are presently retained by the City for other such specialty work at the WtiVTP <br />and at the separate sanitary sewer system pump stations. The design drawings prepared under <br />these professional services sha11 show the design and/or construction work completed by the <br />electrical distriburion and I&C specialists. It is the intention of the City to begin and corn- <br />plete the design and purchase of the electrical distribution and I&C equipment, their conduits <br />and their conductors/wiring as soon as the technical requirements of each component is <br />known. <br />