<br />Mr. Foster McMasters <br />Metcalf & Eddy of Ohio, Inc. <br />May 16, 2000 <br />Page 6 oT 14 <br />d) Install a buried 6" ? DI Centrate Line between the 6" ? DI Centrate Line stub and <br />a point east of the existing 4" ? DI Vacuum Filter Feed Line in the yard south of <br />LPl; - <br />e) Install a temporary, above ground 6" ? DI Centrate Line between the buried 6" ? <br />DI Centrate Line up to a point east of the existing 4" ? DI Vacuum Filter Feed <br />Line in the yard south of LP1 and the east wall of the Sludge Loadout Buildi.ng <br />(SLB); and <br />fl Connect the temporary, above ground 6" ? DI Centrate Line to the buried 6" ? DI <br />Centrate Line between the 6" ? DI Centrate Line stub and a point east of the <br />existing 4" ? DI Vacuum Filter Feed Line in the yard south of LP1. <br />2. Installation of a 2" ? Steel Sanitary Drain Line: <br />a) Core drill a 2" ? hole into the Primary Return Well in the eastern %z of the well; <br />b) Install a buried, double link sealed ?" ? Steel Sanitary Drain Line stub into the <br />core drilled hole; <br />c) Install a flange on the yard piping end of the 2" ? Steel Sanitary Drain Line stub; <br />and <br />d) Install a buried 2" ? PVC Sanitary Drai.n Line between the Primary Retum Well <br />and the eastem edge of the excavation at the Secondary Retum Well for the <br />partially complete 6" ? DI Centrate Line. <br />3. Instailarion of a partially complete 2" ? DI Centrifuge Sludge Feed Line: <br />a) Remove the existing 45° elbow from the eYisting buried 4" ? DI Thermal <br />Conditioning Feed Line in the yard north of the Raw Sludge Storage Building <br />(RSB); <br />b) Install a 4"x4"x2" wye in the existi.ng buried 4" ? DI Thermal Conditioning Feed <br />Line; and . <br />c) Install a buried 2" ? DI Centrifuge Feed Line between the 4"x4"x2" wye and the <br />east wa11 of the SLB. <br />After procuring a repair solid bowl and scroll conveyor in 2001 for the complete dewatering <br />centrifuge system, the second sludge feed piping phase would be constructed. The second <br />sludge feed piping phase is presently expected to be as follows: <br />Construction of a drain in the concrete access box located between the two existing <br />Oxidized Sludge Tanks: <br />a) Core drill a hole in the bottom of the concrete access box south of the existing 4" <br />? DI Thennal Condirioning Feed Line; and <br />b) Install 2" ? PVC drain line between the core drill and the Tunnel A sump pump. <br />{ 2. Complete the installation of a 6" ? DI Centrate Line: