Laserfiche WebLink
?., <br />Mr. Foster McMasters <br />Metcalf & Eddy of Ohio, Inc. <br />??. <br />May 16, 2000 <br />Page 5 or 14 <br />for the 1993 State Issue 2 WWTP Improvements record drawings. Three hard copies of a11 <br />report drawings, design drawings and design details sha11 be submitted to the City along with <br />a diskette or diskettes, if necessary, containing a file for each report drawing, design drawing <br />and design detail prepared during the project. <br />Initial Professional Services <br />An hydraulic analysis shall be completed during the initial services. This analysis sha11 <br />analyze each phase of the expected modifications needed to the existing Thermal Condition- <br />ing Sludge Feed Pumps and the sludge feed piping in order to convert this equipment to the <br />Dewatering Centrifuge Feed Purnps and the sludge feed piping. Also, the hydraulic analysis <br />sha11 also analyze the modifications to the existing vacuum filter feed pumps presently <br />anticipated by the City for converting those pumps to the DeNvatering Centrifuge Sludge <br />Feed Pumps after completion af the project. The City is presently investigating the technical <br />requirements for these modifications with the manufacturer of the existing vacuum filter feed <br />pumps. The results of this investigation will be provided to the selected proposer when the <br />investigation is compieted. <br />Using the Preliminary SLB Layout, the hydraulic analyses shall be based on the head re- <br />quirements of the three dewatering centrifuges under consideration by the City. Attachment <br />5 to this request identifies the head requirement for the three complete dewatering centrifv.ge <br />systems under consideration by the City at the present time. <br />The initial services shall also include preparation of Yard Piping and Tunnel A base maps <br />followed by preparation of drawings for each of the sludge feed piping phase. By preparing a <br />separate drawing for each sludge feed piping phase at this time, the City will be able to begin <br />constructing the initial piping phase during the dewateri.ng centrifuge piTot testing period. <br />The first sludge feed piping phase to be constructed in 2000. The first sludge feed piping <br />phase is presently expected to be as follows: <br />Installation of a partially complete 6" ? DI Centrate Line: <br />a) Remove the existing 3" ? CPVC/SS Carbon Slurry Waste Group "C" line <br />between the Secondary Retum Well and the 90° elbow in the yard south of Low <br />Pressure Oxidation No. 2 Building (LP2) and the Administration Building <br />(ADM); <br />b) Core drill a 8" ? hole into the Secondary Retu.rn Well on the centerline of the <br />abandoned 3" ? CPVC/SS Carbon Sluny Waste Group "C" line; <br />c) Install a buried, double link sealed 6" ? DI Centrate Line stub into the core drilled <br />hole-. <br />