<br />Mr. Foster McMasters <br />Metcalf & Eddy of Ohio, Inc. <br />,vlay 16, 2000 <br />Page 8 of 14 <br />c) Install a buried 2" ? PVC Centrifuge Feed Pumps Instsumentation and Control <br />Conduit between the new core drills in the top of Tunnel A and the east wall of <br />the SLB: d) Extend the 2" ? PVC Centrifuge Feed Pumps Instrumentation and Control <br />Conduit to the two centrifuge feed pumps; and <br />ej Install new control wiring between the Dewatering Centrifuge No. 1 control panel <br />on the east wa11 of the SLB through the completed 2" ? PVC Centrifuge Feed <br />Pumps Instrumentation and Control Conduit and connect to the existing <br />instrumentation and control conduiting and wiring for the two Centrifuge Sludge <br />Feed Pumps. <br />5. Conversion of the temporary 2" ? DU4" ? DI Thermal Conditioning Feed Line into a <br />2" ? DI Dewatering Centrifuge Sludge Feed Line connected to the South Dewatering <br />Centrifuge Feed Pump. <br />a) Remove the 4"x4"x2" wye in the existing buried 4" ? DI Thermal Conditioning <br />Feed Line buried in the yard south of LP l; <br />b) Remove the existing buried 4" ? DI Sludge Feed to Old LPO Line between the <br />RSB and the and blind flange mounted onto the thimble inside the west wa11 of <br />Tunnel A; <br />c) Mount a new blind flange onto the thimble inside the west wa11 of Tunnel A <br />having a one 2" ? DI inserts on the centerline of the existing 4" ? DI Sludge Feed <br />to Old LPO Line; and <br />d) Install a buried 2" ? DI Centrifuge Sludge Feed Line between the new blind <br />flange mounted onto the thimble inside the west wall of Tunnel A and the east <br />wa11 of the SLB. <br />Final Professional Services <br />The final services continue the Yard Piping and Tunnel A base rnapping and drawings <br />prepared for the initial phase into the SLB as well as a11 work inside of the SLB. The fmal <br />services would continue the yard piping of the first phase into the SLB in such a configura- <br />tion that allows for the optimum SLB layout for the selected complete dewatering centrifuge <br />system and a11 other associated equipment and appurtenances to be placed inside the SLB. <br />Consistent with the original sequencing plan for the Project, the 2000 work inside the SLB <br />would be completed before the City implements the design for the second phase of the yard <br />piping and Tunnel A improvements. The original sequencing plan for the Project is Attach- <br />ment 6 to this letter. The original sequencing plan for the Project is being supplied for <br />informational purposes only since the plan will be updated throughout the Proj ect and <br />thereafter. <br />