Laserfiche WebLink
? <br />??• <br />Mr. Foster McMasters <br />Metcalf & Eddy of Ohio, inc. <br /> <br />fvtay 16, 2000 <br />Page 9 of 14 <br />Final services shall include development of drawings and necessary details for all improve- <br />ments to be made inside the SLB. The work inside the SLB is presently expected to be as <br />follows: Installation of a cast-in-place polymer storage tanks pad northeast corner of the SLB <br />area for the placement of up to two polymer storage tanks (One tank would be <br />purchased and installed in 2000. The need for a second tank to be purchased in 2001 <br />would be based on an operability and c.ost analysis to be completed after the complete <br />dewaiering centrifuge system has been completed and in operation for three months.) <br />2. Installation of a cast-in-place dewatering centrifuge for the placement of the East <br />Dewatering Centrifuge and a11 piping a.nd conduiting on the pad required by the <br />dewatering centrifuge. <br />3. Installation of a cast-in-place sludge cake pump pad for the placement of the sludge <br />cake pump that would serve the East Dewatering Centrifuge and a future West <br />Dewatering Centrifuge and a11 piping and conduiting on the pad required by the <br />sludge cake pump. <br />4. Installation of sludge cake piping between the sludge cake pump discharge port and <br />the existing sludge hopper horizontal conveyor. <br />5. Extension of the first phase yard piping through core drilled, steel sleeved, double <br />link sealed penetrations in the east wall of the SLB to the cQmplete dewatering <br />centrifuge system: <br />a) These extensions are to be floor mounted and include the following piping: <br />i) the 6" ? DI Centrate Line; and <br />ii) the two 2" ? DI Dewatering Centrifuge Sludge Feed Lines with each line <br />includi.ng two isolation plug valves surrounding one magnetic flow meter (to <br />be separately procured by the City). <br />6. Extension of the second phase 2" ? PVC Centrifuge Feed Pumps Instrumentation and <br />Control (I&C) Conduit yard piping through core drilled, steel sleeved, double link <br />sealed penetrations in the east wall of the SLB to the complete dewatering centrifuge <br />system I&C equipment to be mounted on the east wall of the SLB. <br />7. Instailatian of the following floor mounted electrical distribution system and I&C <br />conduits fram the electrical and I&C equipment mouuted on the east wall of the SLB <br />to the complete dewatering centrifuge system: <br />a) a 2" ? PVC coated steel primary electric service conduit to the dewatering <br />centrifuge; <br />b) a 1" ? PVC coated steel primary electric service conduit to the sludge cake pump; <br />