My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-074 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2000
>
2000-074 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:11:03 PM
Creation date
12/30/2013 8:44:23 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2000-074
Legislation Date
6/20/2000
Year
2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Foster McMasters <br />Metcaif & Eddy ot Ohio, Inc. <br /> <br />May 16, 2000 <br />Page 10 of 14 <br />c) a 2" ? PVC coated steel instrumentation and control conduit to the dewatering <br />centrifuge and the sludge cake pump; <br />d) a 3/4" PVC coated steel primaty electric service conduit to each magnetic flow <br />meter; and <br />e) a 3/4" PVC coated steel instrumentation and control conduit to each magnetic <br />flow meter. <br />8. Installation of a structural steel platform over the sludge cake feed pump and the <br />sludge cake conveyor for the East Dewatering Centrifuge. <br />9. Installation of a structural steel platfonn over the floor mounted sludge feed piping, <br />electrical distribution conduits and I&C conduits between the east wa11 of the SLB <br />and the East Dewatering Centrifuge. <br />Tasks and Project Scheduie for the 2000 Dewatering Centrifuge Project Professional <br />Services <br />From the above descriptions and sequencing of work and using a notice to proceed date of <br />July 1, 2000, the scope of work for the Technical Proposal shall be based on the following <br />tasks and the idenufied length of time for completion of each project deliverable: <br />1. One (1) working day after issuance of a notice to proceed by the City - provide the <br />selected proposer with the City's record CD containing the electronic files of the <br />1993 State Issue 2 WWTP linprovements record drawings. <br />2. One working da.y after issuance of a notice to proceed by the City - provide a com- <br />plete copy of the technical specifications for 1993 State Issue 2 WWTP Improve- <br />ments. <br />Five (5) working da.ys after issuance of a notice to proceed by the City - return of the <br />City's record CD containing the electronic files of the 1993 State Issue 2 WWTP <br />Improvements record drawings. <br />4. Ten (10) working days after issuance of a notice to proceed by the City - meeting to <br />discuss the fonnat being used by the selected professional for the two hydraulic <br />analyses in the initial services. <br />5. Fourteen (14) working da.ys after issuance of a notice to proceed by the Ciry - <br />submittal of the Yard Piping, Tunnel A, and SLB base map drawings. <br />6. Twenty-one (21) working days after issuance of a notice to proceed by the City - <br />submittal of the two hydraulic analyses in the initial services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.