My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-074 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2000
>
2000-074 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:11:03 PM
Creation date
12/30/2013 8:44:23 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2000-074
Legislation Date
6/20/2000
Year
2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.. ? <br />Mr. Foster McMasters May 16, 2000 <br />? Metcalf & Eddy of Ohio, Inc. Page 11 of 14 <br />7. Twenry-eight (28) working days after issuance of a notice to proceed by the City - <br />submittal of the Yard Piping and Tunnel A plan view design drawings for each <br />piping phase in the initial services showing the follgwing: <br />a) the new 6" ? DI Centrate Line between the two possible dewatering centrifuges <br />and the Secondary Retum Well; <br />b) the two new 2" ? DI Centrifuge Sludge Feed Lines between two complete <br />dewatering centrifuge systerns and the future Dewatering Centrifuge Sludge Feed <br />Pumps; and <br />c) a new 2" ? PVC Centrifuge Sludge Feed Pumping Insmunentation and Control <br />conduit between two possible dewatering centrifuge control panels to be mounted <br />on the east wall of the SLB and the existing conduits ahead of the variable <br />frequency drive for each of the two exisring Thermal Conditioning Sludge Feed <br />Pumps. <br />8. Sixty (60) working da.qs after issuance of a purchase order by the City - submittal of <br />preliminary plan, profile and detail drawings required under the final services for <br />work inside the SLB. <br />9. Sixty-eight (68) working days after issuance of a purchase order by the City - <br />submittal of fmal plan, profile and detail drawings required under the fmal services <br />for work inside the SLB and return of the complete copy of the technical specifica- <br />tions for 1993 State Issue 2 WWTP Improvements. <br />Required Format and Content of the Technical and Cost Proposal <br />The Technical Proposal shall be outlined as follows and shall include the following clearly <br />delineated sections: <br />l. Project Understanding which includes detailed nazrative of the overall understandi.ng <br />of the project and the importance each task to the other tasks and the Project <br />Schedule; <br />2. Project Approach which includes a detailed narrative of each task and its subtasks <br />and the relationship of each task to the other tasks; <br />3. Scope of Services based on the tasks which are proposed to be completed; <br />4. A preliminary list of drawings on which the Technical Proposal is based; <br />5. Project Personnel which includes identification of the key project personnel who will <br />be completing the analyses and design work tasks, the primary office location for <br />each identified key person and resumes for each identified key person; <br />„ : t <br />, ?r.?..., +.-.?t?? ..?... 1 ...? -.. . ?...... .. . .._ ' ""....__, .
The URL can be used to link to this page
Your browser does not support the video tag.