Laserfiche WebLink
. <br />Mr. Foster McMasters May 16, 2000 <br />? Metcalf & Eddy ot Ohio, inc. Page 14 of 14 <br />Attachments <br />1. April 18, 2000 Preliminary Sludge Loadout Building Layout (1 drawing). <br />2. Polymer Feed Pump and Thermal Conditioning/Dewatering Centrifuge Sludge Feed <br />Pumps VFDs technical da.ta ( sheets). <br />3. 1983 WWTP Improvements, 1991 Innovative/Alternative (UA) Modifications, 1992 <br />Natural Gas Line Replacement Project and 1993 State Issue 2 WWTP Improvements <br />drawings (17 drawings). <br />4. Thermal Condirioning Sludge Feed Pumps, Vacuum Filter Sludge Feed Pumps and <br />future dewatering centrifuge sludge feed flow meters technical daxa ( sheets). <br />5. Head requirement for the three complete dewatering centrifuge systems under <br />consideration by the City ( sheets). <br />6. April 4, 2000 Dewatering Centrifuge Project Sequencing Plan (6 pages). <br />7. Fonnat for the Technical Proposal table showing the direct labor hours of each project <br />labor categories expected to be needed for completion of each project subtask (1 page). <br />8. Format for the Cost Proposal ta.ble showing the direct labor hours, indirect costs and <br />reimburseable costs of each project labor categories expected to be needed for <br />completion of each project subtask (1 page). <br />P. Deichmann, City Engineer <br />R. Nichols, WWTP Superintendent <br />D. Long, Environmental Engineer <br />C .F?itTRFPMASTERDOC <br />??_ ?