My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-074 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2000
>
2000-074 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:11:03 PM
Creation date
12/30/2013 8:44:23 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2000-074
Legislation Date
6/20/2000
Year
2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Approach 2-1 <br />W61-S <br />Metcalf & Eddy <br />M&E has prepared an approach that follows the scope of services for the 2000 Dewatering <br />Centrifuge Project as described in pages 5 to 10 of the Request for Proposals. Pipe sizes, <br />materials, routes and installation details will be verified during the design. The sequence of <br />installation will be revised if required to match the equipment selected and the operational <br />requirements developed in conjunction with plant staff during the design. <br />The project approach has been divided into two Tasks and the first task further divided into two <br />Phases: <br />? INITIAL PROFESSIONAL SERVICES <br />? Phase I <br />? Phase II <br />? FINAL PROFESSIONAL SERVICES <br />Our project approach is illustrated in Figure 2-1. <br />INITIAL PROFESSIONAL SERVICES <br />The initial phase of the project will involve: <br />• an hydraulic analysis <br />• development of a base map of the Piping Yazd and Tunnel A <br />• gathering of record drawings for the preparation of a base map for from which the <br />Sludge Loadout Building (SLB) upgrades will be made <br />• development of sludge feed piping plans <br />A more detailed description of our approach to this phase is presented below. <br />l. Prepare hydraulic analyses for the phased installation conditions required to complete the <br />proposed centrifuge installation. The hydraulic analyses of the thermal conditioning <br />sludge feed pumps a,nd the vacuum filter feed pumps will be performed using M&E's <br />System Head Curve Program that develops a series of curves fully describing both the <br />hydraulic conditions and the predicted pump performance. This program was used on the <br />RAS hydraulics evaluation to define the pumping conditions and performance for both <br />the north and south RAS pumps. The performance curves for the south RAS pumps are <br />presented as an example of this program application on Chesterton pumps, similar to the <br />thermal conditioning sludge feed pumps to be evaluated in this project. <br />? "d`#.6M5F+?'d.MM?S/ -::...3k?'?'M'.*?UW??e'kwm-?r..e.. ._..... _.. a".fbyk.?-it "9?F61'?+?5 j??.: 53?Y?•? ?µ?rv.x ?b." _.__ ._ . . i
The URL can be used to link to this page
Your browser does not support the video tag.