My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-074 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2000
>
2000-074 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:11:03 PM
Creation date
12/30/2013 8:44:23 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2000-074
Legislation Date
6/20/2000
Year
2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Projecf Undersfanding 1-3 <br />3. Return activated sludge system hydraulic analysis to extend RAS piping below <br />aeration tank water surface, improving control of dissolved oxygen concentrations in <br />the aeration tanks. <br />- Design matched to both old and new RAS pumps <br />- Analysis af head and flow required for future RAS pump replacement <br />completed as part of analysis <br />- Plans prepared for work done by City employees <br />Together the WWTP staff & M&E made a difference for the City of North Olmsted. <br />- Very low installed costs <br />- Dissolved oxygen control goals met <br />- Sizing for future pump replacement completed concurrently with pipe <br />change evaluation <br />4. Unloading station screen improvement design. <br />- Design developed using materials available from WWTP inventory <br />- Prepared plans for fabrication by City employees. <br />Together the WWTP staff & M&E made a difference for the City of North Olmsted. <br />- Screen design matched to unloading station operation needs <br />- Very low installed costs <br />5. Centrifugal specification and procurement procedures development assistance. <br />- Provided recommendations on centrifuge pilot plant procedures <br />- Developed preliminary pilot plant comparison spreadsheet for selecting <br />unit best meeting City's needs <br />Together the WWTP staff & M&E made a difference for the City of North Olmsted. <br />- Procedure developed for low cost changes from thermal conditioning to <br />centrifugal sludge dewatering <br />- Plan developed to reduce operating costs and odor related complaints at <br />VVWTP <br />Our performance on these projects clearly demonstrates our understanding of the North Olmsted <br />WWTP facilities, its operation needs and the long term goal of minimizing future rate increases. <br />The installation of centrifuge detwatering is on target with the plant's future needs and we <br />strongly endorse implementing the project. <br />We propose the same M&E staff for the 2000 Dewatering Centrifuge project that successfully <br />completed our previous project assignment at the WWTP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.