Laserfiche WebLink
July 8, 1999 <br />Mx. Paul Deichmann <br />Gity Engineer <br />City of North Olmstead <br />5200 Dover Center Road <br />North Olmstead, OH 44070-3129 <br />RE: MODUIED PROPOSAL FOR LANDSCAPE ARCHITECTURAL <br />DESIGN SERVICES/ NORTH OLMSTEAD SKATEPARK <br />Deaz Mr. Deichma.nn: <br />In response ta your letter da.ted June 28 requesting a modified proposal for design <br />services on the proposed ska.tepark in North Olmstead, I ha.ve prepared the following <br />updated proposal. I have included a11 requested scope of work tasks in your letter. <br />As was the case with my previous praposal, I have prepared the scope and fees to provide <br />the most ecanomical and efficient design service available ta the City, recognizing <br />budget constraints. <br />Several budget items are included in this proposal which were not a part of the previous <br />proposal, submitted to Ralph. My origina.l proposa.l assumed: <br />l. Use of the "Wazlord" concept, with minor adjustments to my existing Autacad files. <br />After visiting the site and talking with the skaters, it was clear that this concept could not <br />be used. A new design concept will be necessary, requiring deletion of the bowls and new <br />elements for bikes. Additianal design and Autoca.d drafting time will be necessary to <br />develop the new design concept. <br />2. Additionally, I had not budgeted a site visit during construction. This will be included <br />as an optional task, including flight costs. <br />My Assumprions, Scope of Work, Fees and Schedule for the Skatepark are as follows: <br />A. ASSUMPTIONS: <br />1. A soils report will be provided to me prior to commencement of construction <br />drawings, with recommendatians for slab reinforcement and thickness. <br />2. My preliminary estimate of construction costs (based on a project square footage of <br />10,000 s.f.), and comparable concrete costs in Chicago, Stafford Township, New Jersey <br />and Madison, Wisconsin is approximately $7-8/s.f. or a total of about $70,000-80,000. <br />3. Work shall not be subcantracted without prior consent of the City in writing. <br />4. Additional billable services shall not be performed withaut prior consent af the City in <br />writing. <br />