Laserfiche WebLink
July 8, 1999 <br />Mr. Paul Deichmann <br />City Engineer <br />City of North Olmstead <br />5200 Dover Center Road <br />North Olmstead, OH 44070-3129 <br />RE: MODIFIED PROPOSAL FOR LANDSCAPE A,RCHITECTURAL <br />DESIGN SERVICE5/ NORTH OLMSTEAD SKATEPARK <br />14. No landscape or irrigation planslspecifications are included in the scope of work <br />below. <br />B. SCOPE OF WORK AND FEES: <br />Task No./Descrintion Fgg <br />l. Preparation of a Preliminary Site Pla.n/Details @ 1:20 scale, identifying $1,140 <br />proposed layout of the skatepark. Thi.s design is based upon my <br />discussion with the skaters and proposed design sketches supplied by <br />Ra.e Anne Thomas. A revised cost estimate will accompany <br />the preliminary plan. <br />2. Coordination with your office and Rae Anne to discuss/refine the $260 <br />proposed Preliminary Site Plan. <br />3. Telephone, fax and mail communications. $150 <br />4. Preparatian of preliminary set of construction plans, for City staff $2,790 <br />and skater review/refinement. These plans will be finali.zed, after City <br />review. One (1) interim City review is budgeted. <br />5. Consultation with City Officials and Bidders $260 <br />6. Site Visit During Construction/Optional, if authorized $1,140 <br />7. Reimbursables (Airfare, printing, UPS, plotting, hotel) $825-1,225 <br />Note: The range above for reimbursables is reflected as a range; airfaze is <br />less on weekends, and greater during the week. The site visit will be <br />scheduled based on scheduling by City staff. <br />TOTAL NOT TO EXCEED FEE: $6,565-6,965 <br />My cost will be $65/hr for supplementary work tasks not identified above, but negotiated <br />with the City as needed. <br />please dire.ct all mail and written correspQn n o• <br />Alan Fishman <br />35125 Los Pinos Rd. <br />Rancho Capistrano, CA 92530 <br />