Laserfiche WebLink
•;?_?? <br />EXPERIENCE: <br />Ms. Price is responsible for the preparation of contract documents and specifications for highway and <br />road reha.bilitation projects. She has prepared paving plans, maintenance of traffic plans and plans <br />for utility relocations. She has also contributed to the construction inspection of highway, bridge, and <br />utility projects. Her project experience includes: <br />LOR-57-13.051, Replacement of the bridge over Hill Spaulding Ditch in the V'illage of <br />Grafton, Lorain Couxrty, Ohio, for the Ohio Department of Transportation. Responsibilities <br />included the preparation of the roadway plans consisting of typical sections, plan, profile, <br />cross sections and maintenance of traffic plans. Traffic was maintained by using two-way <br />traffic on a single lane controlled by traffic signals. <br />LOR-3 SP-0.95, Replacement of the bridge over Wellington Creek in Findley State Paxk, <br />Lorain County, Ohio, for the Ohio Department of Transportation. Prepared the roadway <br />plans showing the work to be done on the highway approaches, which included a bikeway. <br />Design Engineer: Rehabilita.tion and Resurfacing of Smith Road from 5now Road to <br />Brookpark Road in the City of Brook Park, Ohio, for the Cuyahoga County Engineer. The <br />work consisted in preparing plans for the improvement of a 1.6 km section by resurfacing and <br />partial replacement of curbs, driveway aprons, sidewalks and underdrains along 1.3 km, and <br />by full-depth pavement replacement along 0.3 km. In the pavement replacement section, pier <br />protection was provided at the railroad bridge by construction a new median concrete barrier. <br />Design Engineer: Rehabilita,tion of Warner Road from Granger Road to Cana1 Road in the <br />Village of Va11ey View, Ohio, for the Cuyahoga County Engi.neer. The work called for the <br />improvement of a 0.38 km section of road by full-width pavement replacement, inciuding <br />draiWe improvements and the replacement of a11 ca.tch basins. Paving plans were prepared <br />to show joint layouts, and details were prepared for the work on the approach slabs of the <br />bridge over the Ohio Canal, which is within the project limits. <br />Construction Inspector: Construetion of the Third Lane of the Ohio Tumpike, for the Ohio <br />Turnpike Commission. Duties included review of contractor's progess, preparation of <br />change orders, ensuring that work was performed in accordance with plans and specifications. <br />_