Laserfiche WebLink
<br /> <br />WHEREAS, the Director of Public Service determined that said bid of <br />CONTRACTOR was the lowest bid for the PROJECT work; and <br />VVHEREAS, the CITY Boazd of Control, on February 11, 2003, deternuned that <br />CONTRACTOR'S Bid was the lowest and best bid by a responsible bidder for the <br />PROJECT work, and awarded the contract for said work to CONTRACTOR; <br />NOW THEREFORE, the CITY and the CONTRACTOR each acknowledging the <br />sufficiency of the consideration, which flows to them pursuant to this Agreement, agree as <br />follows: <br />SECTION 1. BASIC WORK OF THE CONTRACTOR <br />1.1 The PROJECT Work to be performed under this Agreement sha11 <br />encompass BID PACKAGE # for construction of the New North Olmsted Library. <br />1.2 The scope and details of the PROJECT Work are more fully described in <br />Exhibit I and Exhibit IV, Scope of Work, attached hereto and made a part hereof. <br />SECTION 2 ADDITIONAL WORK OF THE CONTRACTOR <br />2.1 No additional Work is expected to be required in carrying out the <br />construction of the PROJECT. However, should any additional Work by the <br />CONTRACTOR become necessary, any additional Work would be separate from the <br />Section 1- Basic Work of the Contractor, and would be incorporated into the work of the <br />CONTRACTOR by a field work order or change order authorized pursuant to the <br />provisions of SECTION 10 of this Agreement. <br />SECTION 3. CONTRACT DOCUMENTS <br />3.1 The Contract Documents, which include this Agreement, are defined in the <br />General Conditions. The Contract Documents, which comprise the entire agreement <br />between CITY and CONTRACTOR, are incorpora.ted herein by reference as if fully re- <br />stated herein, and are made a part hereof. <br />2 <br />