<br />-3-
<br />reconstructing water mains and water service connections where necessary in Frank Street;
<br />(viii) grading, draining, curbing, reconstructing the pavement base, preparing the surface and
<br />paving with concrete, rehabilitating sewer service connections, constructing sidewalks and
<br />driveway aprons, installing above-ground wires and cables for street lighting, reconstructing
<br />water mains and water service connections where necessary, reconstructing storm sewers where
<br />necessary, and constructing and reconstructing catch basins where necessary in Coe Avenue;
<br />(ix) grading, draining, curbing, reconstructing the pavement base, widening, preparing the
<br />surface and paving with concrete, constructing storm sewers and catch basins, reconstructing
<br />sidewalks and driveway aprons, installing underground and above-ground wires and cables for
<br />street lighting, reconstructing water mains and water service connections where necessary, and
<br />reconstructing and rehabilitating sanitary sewers and sanitary sewer service connections where
<br />necessary in Park Lane, Ambour Drive and Beech Lane; (x) grading, draining, curbing,
<br />reconstructing the pavement base, preparing the surface and paving with concrete, reconstructing
<br />driveway aprons, constructing and reconstructing catch basins, installing underground and
<br />above-ground wires and cables for street lighting, reconstructing water mains, water service
<br />connections and sidewalks where necessary, and reconstructing and rehabilitating sanitary
<br />sewers, sanitary sewer service connections and storm sewers where necessary in Noreen Drive,
<br />Palm Drive and Birch Lane; (xi) grading, draining, curbing, reconstructing the pavement base,
<br />preparing the surface and paving with concrete, constructmg and reconstructing catch basins,
<br />installing above-ground wires and cables for street lighting, reconstructing water mains, water
<br />service connections, storm sewers, sidewalks and driveway aprons where necessary, and
<br />reconstructing and rehabilitating sanitary sewers and sanitary sewer service connections where
<br />necessary in Hawkins Road; (xii) grading, draining, curbing, reconstructing the pavement base,
<br />widening, preparing the surface and paving with concrete, constructing storm sewers, catch
<br />basins, sidewalks and driveway aprons, installing underground and above-ground wires and
<br />cables for street lighting, reconstructing water mains and water service connections where
<br />necessary, and reconstructing and rehabilitating sanitary sewers and sanitary sewer service
<br />connections where necessary in Esther Avenue; (xiii) grading, reconstructing the pavement base,
<br />widening, paving with asphalt, constructing and reconstructmg storm sewers and catch basins,
<br />reconstructing and rehabilitating sanitary sewers and sanitary sewer service connections where
<br />necessary, and reconstructing sidewalks and driveway aprons where necessary in Alexander
<br />Road; (xiv) grading, draining, curbing, reconstructing the pavement base, preparing the surface
<br />and paving with concrete, constructmg and reconstructing storm sewers and catch basins,
<br />reconstructing sidewalks and driveway aprons, installing underground and above-ground wires
<br />and cables for street lighting, reconstructing water mains and water service connecrions where
<br />necessary, and reconstructing and rehabilitating sanitary sewers and sanitary sewer service
<br />connections where necessary in Westchester Drive; (xv) grading, draimng, curbing,
<br />reconstructing the pavement base, preparing the surface and paving with concrete, constructing
<br />and reconstructing storm sewers and catch basins, reconstructing sidewalks and driveway aprons,
<br />installing underground and above-ground wires and cable for street lighting, reconstructing water
<br />mains, water service connections and sanitary sewer service connections where necessary, and
<br />reconstructing and rehabilitating sanitary sewers where necessary in Olmsted Oval;
<br />(xvi) grading, draiting, curbing, reconstructing the pavement base, widening, preparing the
<br />surface and paving with concrete, constructing storm sewers and catch basins, constructing and
<br />reconstructing sidewalks, reconstructing driveway aprons, installing underground and
<br />above-ground wires and cables for street lighting, reconstructing water mains, water service
<br />connections and sanitary sewer service connections where necessary, and reconstructing and
<br />rehabilitating sanitary sewers where necessary in Macbeth Avenue; and (xvii) grading, draining,
<br />D03:[00523.DOCS.NOR05223]ORD STREETS_$7.660
|