Laserfiche WebLink
,?,•, <br />.,.r <br />SECTION 4-PERIOD OF SERVICE <br />4.1. The provisions of this Section 4 and the various <br />rates of compensation for ENGINEER's services pro- <br />vided for elsewhere in this Agreement have been agreed <br />to in anticipation of the orderly and continuous prog- <br />ress of the Project through completion of the Construc- <br />tion Phase. ENGINEER's obligation to render services <br />hereunder will extend for a period which may reason- <br />ably be required for the design, award of contracts and <br />construction of the Project including extra work and <br />required extensions thereto. <br />4.2. The services called for in the Study and Report <br />Phase will be completed and the Report submitted <br />within the stipulated period indicated in paragraph 2 <br />of Exhibit A"Further Description of Basic Engineering <br />Services and Related Matters" after authorization to <br />proceed with that phase of services. <br />4.3. After acceptance by OWNER of the Study and <br />Report Phase documents indicating any specific mod- <br />ifications or changes in the extent of the Project desired <br />by OWNER, and upon written authorization from <br />OWNER, ENGINEER shall proceed with the perfor- <br />mance of the services called for in the Preiiminary <br />Design Phase, and shall submit preliminary design doc- <br />uments and a revised opinion of probable Project Cost <br />within the stipulated period indicated in paragraph 3 <br />of Exhibit A"Further Description of Basic Engineering <br />Services and Related Matters" after authorization to <br />proceed with that phase of services. 4.4. After acceptance by OWNER of the Preliminary <br />Design Phase documents and revised opinion of prob- <br />able Project Cost, indicating any specific modifications <br />or changes in the extent of the Project desired by <br />OWNER, and upon written authorization from <br />OWNER, ENGINEER shall proceed with the perfor- <br />mance of the services called for in the Final Design <br />Phase; and shall deliver Contract Documents and a <br />revised opinion of probable Project Cost for all work <br />of Contractor(s) un the Project within the stipulated <br />period indicated in paragraph 4 of Exhibit A"Further <br />Description of Basic Engineering Services and Related <br />Matters" after authorization to proceed with that phase <br />of services. <br />4.5. ENGINEER's services under the Study and Re- <br />port Phase, Preliminary Design Phase and Final Design <br />Phase shall each tie considered complete at the earlier <br />of (1) the date when the submissions for that phase <br />have been accepted by OWNER or (2) thirty days after <br />the date when such submissions are delivered to <br />^'N, <br />? <br />OWNER for final acceptance, plus such additional time <br />as may be considered reasonable for obtaining approval <br />of governmental authorities having jurisdiction over <br />design criteria applicable to the Project. <br />4.6. After acceptance by OWNER of the ENGI- <br />NEER's Drawings, Specifications and other Final De- <br />sign Phase documentation including the most recent <br />opinion of probable Project Cost and upon written au- <br />thorization to proceed, ENGINEER shall proceed with <br />performance of the services called for in the Bidding <br />or Negotiating Phase. This Phase shall terminate and <br />the services to be rendered thereunder shall be consid- <br />ered complete upon commencement of the Construc- <br />tion Phase or upon cessation of the negotiations with <br />prospective Contractor(s) (except as may be otherwise <br />required to complete the services called for in paca- <br />graph 6.2.2.5). <br />4.7. The Construction Phase will commence with the <br />execution of the first prime contract to be executed for <br />the work of the Project or any part thereof, and will <br />terminate upon written approval by ENGINEER of <br />final payment on the last prime contract to be com- <br />pleted. Construction Phase services may be rendered <br />at different times in respect of separate prime contracts <br />if the Project involves more than one prime contract. <br />4.8. If OWNER has requested significant modifica- <br />tions or changes in the extent of the Project, the time <br />of performance of ENGINEER's services and his var- <br />ious rates of compensation shall be adjusted appropri- <br />ately. <br />4.9. If OWNER fails to give prompt written authori- <br />zation to proceed with any phase of services after com- <br />pletion of the immediately preceding phase, or if the <br />Construction Phase has not commenced within 365 <br />calendar days (plus such additional time as may be <br />required to complete the services called for under para- <br />graph 6.2.2.5) after completion of the Final Design <br />Phase, ENGINEER may, after giving*seven days' writ- <br />ten notice to OWNER, suspend services under this <br />Agreement. <br />4.10. If ENGINEER's services for design or during <br />construction of the Project are delayed or suspended <br />in whole or in part by OWNER for more than three <br />months for reasons beyond ENGINEER's control, <br />ENGINEER shall on written demand to OWNER (but <br />without termination of this Agreement) be paid as pro- <br />vided in paragraph 5.3.2. If such delay or suspension <br />extends for more than one year for reasons beyond <br />ENGINEER's control, or if ENGINEER for any rea- <br />son is required to render services more than one year <br />Page 7 of _ i5 _ pages