My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
83-018 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1983
>
83-018 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2014 12:36:23 PM
Creation date
12/26/2013 9:40:47 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
83-018
Legislation Date
12/1/1987
Year
1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10*? <br />v.0W <br />° <br />after Substantial Completion, the various rates of com- <br />pensation provided for elsewhere in this Agreement <br />shall be subject to renegotiation. <br />4.11. In the event that the work designed or specified <br />by ENGINEER is to be performed under more than <br />one prime contract, OWNER and ENGINEER shall, <br />prior to commencement of the Final Design Phase, <br />develop a schedule for performance of ENGINEER's <br />services during the Final Design, Bidding or Negoti- <br />ating and Construction Phases in order to sequence <br />and coordinate properly such services as applicable to <br />the work under such separate contracts. This schedule <br />is to be prepared whether or not the work under such <br />contracts is to proceed concurrently and is to be in- <br />cluded in Exhibit A"Further Description of Basic En- <br />gineering Services and Related Matters," and the pro- <br />visions of paragraphs 4.4 through 4.10 inclusive, will <br />be modified accordingly. <br />[The remainder of this page was left blank intentionally.] <br />Page 8 of - 15 _pages
The URL can be used to link to this page
Your browser does not support the video tag.