My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
83-049 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1983
>
83-049 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2014 12:36:32 PM
Creation date
12/26/2013 9:40:53 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
83-049
Legislation Date
6/7/1983
Year
1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction of Southeast Side Maintenance Yard <br />Construction of Crown Plant Railroad Track Extension <br />Noltingham Electrical, Valve, Piping, lnslrument, Control & Heating & Ventilaling En. •g. <br />+?. Cotislruction o( State-Brecksville Supply Main <br />Fairmount Pump Station First High Service Pressure Study <br />? Crown Plant Expansion Engineering <br />Kirlland [ntake Crib Renovation <br />Construction of Oakes/f3roadview-Avery Supply Main <br />Construction of Kirtland Pumping Stalion Machine Shop Roof <br />Construclion of Fairmount Pumping Station Roadway and Site Improvements <br />Electric Motors in Secondary Pumping Stations <br />Installation of Cathodic Protection at Kirtland Raw Water Pump Station <br />Chemical Feed Facilities for Outlying Areas <br />Construction of Harvard Yard Truck Wash <br />Construction of Phase 2 of New Division Filter Plant <br />Cleaning and Relining Water Mains <br />Purchase & Installation of Hydrants, Valves & Pipe Replacement <br />Construction of New Distribution Mains <br />Purchase and Installation of Remote Oulside Reading Meters <br />System Hydraulic Survey Service <br />Construction of Security Facilities-All Locations <br />PHASE 4 <br />New Solon Water Tower <br />Installation of Ball Valves in Secondary Pumping Stations <br />Constuction of Belvoir-Glenridge Supply Main <br />Conversion of Fire Proteclion Mains to Downtown Low Service Use <br />New Forest Hills Water Tower <br />Installation of Carbon Slurry Feed System at Crown Plant <br />Construclion of Baldwin Purirication Heating Boilers <br />Construction of Euclid Creek Channel Thru Nottingham Site <br />Construction of Shepard Reservoir <br />Construction of Chagrin Reservoir <br />Construction of Tungsten-Babbit Supply Main <br />• Conslruction of Phase 3 New Division Filter Plant <br />Cleaning and Relining Water Mains <br />Purchase & Installation of Hydrants, Valves & Pipe Replacement <br />Construction ol' New Distribution Mains <br />Purchase and Installation of Remote Outside Keading Meters <br />System Hydraulic Survey Service <br />Construction of Security Facilities-All Locations <br />19
The URL can be used to link to this page
Your browser does not support the video tag.