My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
83-049 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1983
>
83-049 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2014 12:36:32 PM
Creation date
12/26/2013 9:40:53 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
83-049
Legislation Date
6/7/1983
Year
1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PHASE 5 <br />?*. Construction of Nottingham Electrical, Valve, Piping, Instrument, Control Heating, Venlilating <br />Construction of i.rown Plant Expansion <br />? Division Intake mprovements <br />Construction of Warrensville-Broadway Supply Main <br />Construction of Engle Road Booster Pump Station <br />Installation of C athodic Prolection at Division Pump Station <br />Construction of New Warrensville 3rd High Service Pump Station New Norlh Hill; Water Tower <br />Cleaning and Relining Water Mains . <br />Purcliase and Ir.stallation of Hydrants, Valves & Pipe Replacement <br />Construction o( New Distribution Mains <br />Purchase and Installation o( Remote Outside Reading Meters <br />System Hydraulic Survey Service <br />Conslruction oC Sccurity Facilities-All Locations <br />PHASC 6 <br />Fairmount Pump Station Truck Loading Dock <br />Construction of Fulton/Denison-Brookpark Supply Main <br />Construction o! Fulton-Brecksville Supply Main <br />New Chemical Feed & Storage Facilities at Baldwin Water Purircation Plant <br />Installation of Random Supply Water Mains <br />Division Filter Flant Site Structure Removal <br />Remodel Fairmount Boiler & Coal Storage Building lo Administration & General Storage <br />Replacement of Pilter Valves & Controls at Division Water Purification Plant <br />Construction of 211d Pleasant Valley Reservoir <br />Installation of 1 st Section Crown-Sprague Supply Main <br />Division Watcr ?lant Clear Well Restoration <br />Construction of Ridge Road Supply Main <br />Ncw Bedford-A -xander Water 7'ower <br />New Miner Wat -r Tower <br />Construction of Crown Shore Shaft Erosion Control <br />Construction of Lakc Shore-Lakeland Sapply Main <br />Construction o( I3rookpark-Dcering Sapply Main <br />Inslallation of : id Section Crown-Sprague Supply Main <br />Nollingham Plz it Addilion to Clear Wcll, Engrg. <br />Construclion of 2nd Parma Rcservoir <br />Construction of Wcst 73rd-Denison Standpipe Reservoir <br />Construclion ol 2nd Engle Road Reservoir <br />Expansion of E.gle Road 2nd High Service Pump Station <br />lnstallalion o( ` ?raguc-Pearl Supply Main <br />Construction o Columbia-Sprague 21ld High Service Pump Station <br />Construction o: Nottingham Plan( Addilion 24 Million Gallon Clear Well Reservoir <br />Crown Plant A dition to Clcar Wcll, Engrg. <br />Construction ot Crown PIan1 Additional 20 Million Gallon Clcar Wel) Reservoir <br />System Hydrau c Survey Scrvicc <br />20
The URL can be used to link to this page
Your browser does not support the video tag.