My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
84-091 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1984
>
84-091 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2014 12:39:33 PM
Creation date
12/26/2013 9:50:36 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
84-091
Legislation Date
10/16/1984
Year
1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.? ? <br />(b) Collection Svstem Cost Rate (CSR) <br />A proportionate rate for the collection of sewage shall be <br />charged to all users receiving wastewater services. <br />A separate rate shall be charged to North Olmsted users, <br />Fairview Park users and Olmsted Township users based on the <br />proportional length of the total City sanitary collection <br />sewer system attributable to each Service Area. The total <br />proportional length for each Service Area will be based on <br />the sum of the percentage contribution of sanitary base f low <br />in all City sanitary collection sewers. <br />The proportionate rate shall be based on the following <br />formula: <br />CSR = (F) (B) <br />AWC <br />Where: F= The ratio of the total proportional length of <br />the City sanitary collection sewer system <br />attributable to the respective Service Area, <br />to the total City sanitary collection sewer <br />system. <br />B= Total annual North Olmsted sanitary collection <br />system aperation, maintenance and replacement <br />cost. <br />AWC = Total annual respective Service Area water <br />consumption in thousand cubic f eet (MCF) <br />(c) New Debt Service Cost Rate (NDR) <br />A proportionate rate for repayment of financing local share <br />capital costs to implement wastewater treatment plant <br />improvements associated with Environmental Protection Agency <br />Construction Grant C-391665-03, shall be charged to all users <br />receiving wastewater services based on the following formula: <br />NDR = C <br />SWC <br />Where: C= Total new annual debt service cost incurred by <br />North Olmsted to finance payment of new system <br />improvements. <br />3WC = Total annual system water consumption in <br />thousand cubic feet (MCF) <br />-3-
The URL can be used to link to this page
Your browser does not support the video tag.