Laserfiche WebLink
CITY OF NORTH OLMSTED <br />,ORDINANCE N0. 87-136 <br />PAGE SIX <br />1321.04 ELECTRICAL LICENSE AND FEES. <br />The following fee schedule shall prevail for all electrical work performed: <br />(a) Certificate of Registration: <br />Reference is made to Codified Ordinance Section No. 1317.08. <br />(1) Registration fee (Calendar Year)----------- <br />-------------------- <br />--------- 75.00 <br />(2) Renewal (if made by January 31st of following year of registration)----- $ 50.00 <br />(3) After August 31st, prior to November 20th------------------------------- $ 40.00 <br />(4) After November 20th (certif icate will be issued for following year)----- $ 75.00 <br />(b) Work to be Performed: <br />(1) Residential, new construction____________________________________ <br />------- $ 50.00 <br />(2) Residential, additions or alterations <br />(a) Minimum fee--------------------------------------------------------- $ 15.00 <br />(b) Per outlet and switches____________________________________________ $ .75 <br />(c) Outlets in excess of 120 volts per outlet--------------------------- $ 2,00 <br />(3) Commercial or industrial, new. construction or additions: <br />(a) Minimum fee------------------------- <br />-------------------------------- $ 30.00 <br />(b) Also per receptacle, unit fixture or outlet------------------------- $ 1.00 <br />(4) High intensity lighting outlets: <br />(a) Motion picture projector of 1,000 Watts or more--------------------- $ 25.00 <br />(b) Light outlets of 1,000 Watts or more-------------------------------- <br />$ 25.00 <br />(c) Outlets for: heat treating equipment, welding equipment, <br />permanent wave apparatus, hair dryers and similar commercial <br />devices each: <br />Over 10 kilowatts--------------------------------------------------- $ 15.00 <br />(d) Power outlets: transformers, generators, batteries <br />(prim. and second), rectifiers, electrostatic filters <br />and motors, including controls, distribution and connections <br />thereto, each: <br />Up to 1 HP---------------------------------------------------------- $ 5.00 <br />Over 1 HP, up to 3 HP----------------------------------------------- $ 6.00 <br />Over 3 HP, up to 6 HP----------------------------------------------- $ 8.00 <br />Over 6 HP, up to 10 HP---------------------------------------------- $ 10.00 <br />Over 10 HP, up to 15 HP--------------------------------------------- $ 16.00 <br />Over 15 HP---------------------------------------------------------- <br />$ 18.00 <br />(e) X-Ray machines and equipment, each---------------------------------- $ 20.00 <br />NOTE: See Homeowners' Permit <br />1321.05 PERMIT CONDITIONS AND SPECIAL FEES <br />(a) Building permits issued under th is fee schedule shall expire as follows• <br />(1) Homeowners permit - 3 months from the date of issuance. <br />(2) All others as follows: <br />(a) Under $10,000 evaluation - 4 months from the date of issuance <br />(b) $10,000 to $50,000 evaluation - 6 months from the date of issuance <br />(c) Over $50,000 - 9 months from the date of issuance. <br />(NOTE: Two extensions equal to the original time period allotted may be granted <br />provided circumstances warrant and it is requested in writing within ten days <br />of the expiration date.) <br />(b) Reinspection fees: (not applicable to homeowners' permits)• <br />(1) If an inspection is requested and for any reason the work is found unsatisfactory <br />or incomplete, a $10.00 fee shall be assessed. <br />(2) If work is covered without benef it of an inspection, it shall be revealed and a <br />$15.00 fee assessed. <br />(3) For all permits where a final inspection has not been requested, in writing, prior <br />to the expiration of the permit, an inspection shall be made 15 days after the ex- <br />piration date and a $25.00 fee assessed. (Exception: Written request for an ex- <br />tension has been received.) <br />_r, .. ,~,.... ~w.w.-... <br />