Laserfiche WebLink
data comprising the Contractor's Application for Payment, that <br />the Work, ro the best of the Architect's knowledge, infomia- <br />tion and belief, has progressed to the point indicated and that <br />quality of the \X'ork is in accordance R•ith the Contract Docu- <br />mencs. The issuance of a Cenificate for Payment shall noc be a <br />representation thac the Architect has (i) made exhaustive or <br />continuous on-site inspections to check the quality or quantity <br />of the Work, (2) reviewed construction means, methods, tech- <br />niques, sequences or procedures, (3) reviewed copies of requi- <br />sitions received from Subcontractors and material suppliers and <br />other data requested by the Owner to substantiate the Contrac- <br />tor's right to pa}•ment or (4) ascenained how or for what pur- <br />pose the Contractor has used mone}, previously paid on <br />account of the Contract Sum. <br />2.4.10 The Architect shall have authority to reject V'ork which <br />does not conform to the Contract Documents and wiA have <br />authority to require additional inspection or testing of the <br />Work afienever, in the Architect's reasonable opinion, it i5 <br />necessary or advisable tor the implementation ot the intent of <br />thr Contract Documents. <br />2.4.11 The Architect shall review and approve or cake other <br />appropriace action upon Contrac[or's submittals such as Shop <br />Drawings, Product Data and Samples, but only for the limited <br />purpose of checking for conformance with information given <br />and the design concept expressed in the Contract Documents. <br />The Architect's action shall be,taken v,•ith such reasonable <br />prompmess as to cause no delay. The Archirect's apProval of a <br />specific item shall not indicate approva] of an assembly of <br />afiich the item is a component. When professional certification <br />of performance characteristics of materials, systems or equip- <br />ment is required b}' the Contract Documents, the Architect <br />shall be entitled to rely upon such certification to establish that <br />the materials, systems or equipment will meet the performance <br />criteria required b), the Contract Documents. <br />2.4.12 The Architect shall prepare Change Orders and Con- <br />struction Change Directives, with supponing documenta[ion <br />and data if authorized or confirmed in a•riting b}' the Owner as <br />provided in Paragraphs 3.1 and 33, for the Owner's approval <br />and execution in accordance with the Contract Documents, <br />and ma}' authorize minor changes in the Work not involving an <br />adjustment in the Contract Sum or an extension of the Contract <br />Time a•hich are not inconsistent with the intent of the Contract <br />Documents. <br />2.4.13 The Architect shall conduct inspections to determine <br />the dates of Substantial Complecion and final completion and <br />shall issue a final Certificate for Payment. . <br />2.4.14 Thc Architect shall interpret and decide matters con- <br />cerning perfc>rmance of the Owner and Contractor under the <br />requirements of the Contract Documents on a,ritten request of <br />either the Owner or Contractor. The Architect's response to <br />such requescs shall be made with reasonable promptness and <br />w•ithin anv time limits agreed upon. \\'hen making such inter- <br />pretations and initial decisions, the Architect shall endeavor to <br />secure faithful perfurmance b}• both Owner and Contractor, <br />shall not shon- partiality to either, and shall not be liable for <br />results of intrrpretations or decisionc so rendered in good faith. <br />ARTICLE 3 <br />ADDITIONAL SERVICES <br />3.1 Additional Services shall be provided if authorized or con- <br />Fumed in a•riting by the Owner or if included in Artide 12, and <br />they shall be paid for by the Owner as provided in this Agree- <br />ment. Such Additional Services shall include, in addition to <br />those described in Paragraphs 3.2 and 3•3, budget analysis, <br />fmancial feasibility studies, planning surveys, environmental <br />studies, measured drawings of existing conditions, coordina- <br />tion of separate contractors or independent consultants, coor- <br />dinadon of construction or project managers, detailed Con- <br />struction Cost estimates, quantity surveys, interior design, plan- <br />ning of tenant or rental spaces, inventories of materials or <br />equipment, preparation of record drawings, and any other ser- <br />vices not otherwise inciuded in this Agreement under Basic Ser- <br />vices or not customarily fumished in accordance with generally <br />accepted uchitectural practice. <br />3.2 If more extensive representation at the site than is <br />described in Subparagraph 2.4.5 is required, such additional <br />project representation shall be provided and paid for as set <br />forth in Articles l 1 and 12. <br />3.3 As an Additional Sen>ice in connection with Change <br />Orders and Construction Change Direc[ives, the Architect shall <br />prepareDrawings, Specifications and other documentation and <br />data, evaluate Contractor's proposals, and provide an}, other <br />services made necessary b)• such Change Orders and Construc- <br />tion Change Directires. <br />ARTICLE 4 <br />OWNER'S RESPONSIBILITIES <br />4.1 The Owner shall provide full information, including a pro- <br />gram which shall set forth the Owner's objectives, schedule, <br />constraints, budget with reasonable contingencies, and criteria. <br />4.2 The Owner shall fumish surveys describing physical char- <br />acteristics, lega] limitations and utilit), locations for the site of <br />the Project, a written legal description of the site and the ser- <br />vices of geotechnical engineers or other consultants afien such <br />services are requested by the Architect. <br />4.3 The Owner shall fumish swctural, mechanicaJ, chemical, <br />air and water pollution tests, tests for hazardous materials, and <br />other laboratory and environmenta] tests, inspections and <br />repons required by law or the Contract Documents. <br />4.4 The MTneT`shall fumish all legal, accounting and insurance <br />counseling services as may be necessar}, at any time for the <br />Project, including auditing services the Owner may require to <br />verify the"Contractor's Applications for PaNImeni or to ascertain <br />how or for wfiat purposes the Convactor has used the money <br />paid b), the Oa•ner. <br />4.5 The foregoing sen•ices, information, sun•eys and reports <br />shall be fumished at the Owner's expense, and the Architect <br />shall be entitled to rely upon the accuracy and completeness <br />thereof. <br />4.6 Prompt written notice shall be given b)• the Owner to the <br />Architect if the Owner becomes aware of any fault or defect in <br />the Project or nonconformance a•ith the Contract Documenu. <br />4.7 The proposed language of certificates or certifications <br />requested of the Architect or Architect's consultants shall be <br />submitted ro the Architect for review and approeal at least 14 <br />days prior to execution. <br />3 B151-1987 AIA DOCUMENT 8151 0 ABBRE\'UTEDOU'NEH-ARCHITECTAGREEMEtiT•THIRDEDITION•AIAE • OIyR7 <br />THE AMER1CAti 1NSTITI'TE OF ARCHITECTS, 1735 NEXC 1'ORK A\'ENl'E, N.V(., V('ASHINGTOK, D.C. 200U6