My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-016 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1993
>
93-016 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 3:46:32 PM
Creation date
1/9/2014 9:35:15 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
93-016
Legislation Date
3/2/1993
Year
1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Schedule A <br />Scope of Basic Engineering Services and Related Matters <br />1.1.1 The scope of basic servicesl consists of this page plus the following documents, attached and made <br />part of this Agreement: <br />a. Scope of Basic Engineering Services, Pages A-2 and A-3. <br />b. Preliminary Work Schedule, Page A-4. <br />c. Preliminary Drawing List, Pages A-5 to A-8. <br />1.1.2 Subcontractors required for activities under this Schedule A will be ident'if'ied prior to the <br />commencement of such activities. <br />a. The subcontractors' for the SCHEDLJLE A services will be retained by both the Client and <br />Malcolm Pirnie. Malcolm Pirnie will dire.ct, coordinate and integrate all subcontractors' work into <br />the project to ensure a quality product. The scope of subcontractor's work under the SCHEDULE <br />A services involves: <br />1. Surveying Services: Design Phase surveying services from John E. Foster & Associates, Inc. <br />will be provided as a subcontractor to Malcolm Pirnie. <br />2. Geotechnical Services: Design Phase geotechnical and materials engineering and laboratory <br />testing services from Resource International, Inc. will be provided as a subcontractor to <br />Malcolm Pirnie. <br />3. Detailed Design Services: Design Phase services from John E. Foster & Associates, Inc. will <br />be provided as a subcontractor to Malcolm Pirnie for a two month period to assist in <br />development of the Project Manual for the two bid packages. <br />4. Project Representation: A resident project representative from John E. Foster & Associates, <br />Inc. will be furnished by the Client as necessary to monitor the construction work of each <br />bid package. <br />' Construction phase services under this Agreement shall be performed in accordance with Schedule D insofar <br />as applicable and appropriate. <br />NODFS.C/djl <br />1443-003 <br />w-i
The URL can be used to link to this page
Your browser does not support the video tag.