Laserfiche WebLink
. . ....,...-.....c... . ._. ..i .. . . .. . <br />. _ . . ...........?,.?.«:,. » i - .... . .. . . ... . . . . .. _,.. ... . <br />? SCHEDULE A- SCOPE 6%.?,SASIC ENGINEERING SERVICES RELATED MATTERS <br />lrhe. basic services to be performed by Malcolm Pirnie and its subconsultants under this Agreement are as follows: <br />A. DESIGN PHASE <br />1. Surveying Services: <br />a. Obtain all available records and perform all field surveys to establish the horizontal and vertical control and <br />aligmment for the proposed improvements. <br />b. Update the 1992 North Olmsted Wastewater Treatment Plant site plan drawing on a 24" x 36" mylar sheet at <br />a 1" = 50' scale, based on the surveying services included in the this task. <br />2. Drafting Services: <br />a. Prepare plan and profile sheets at appropriate scales on 24" x 36" sheets. All drafting to be done using AutoCad <br />software. All survey points to be included on the drawing. Show all utilities in plan and profile. Topographical <br />features such as trees, poles, signs, culverts, etc. All other topograpluc and elevation data developed above will <br />be included. <br />b. All lettering on the plan & profile sheets to be done with AutoCad per Malcolm Pirnie drafting standards. <br />c. All final plans will be reviewed by the City Engineer. Submit three iaterim copies of the plan sheets on <br />reproducible material for review. After approval by the City Engineer, submit one set of plans on wash-off <br />mylars. <br />3. Detailed Des[gn Documents: <br />a Detailed design drawings for two separate construction contracts will be prepared for use in bidding and con- <br />structing the each bid package iacluded in the Projed. The preliminary lists of drawings for each separate <br />construction contrad are included in SCHEDULE A. <br />b. A Projed Manual will be developed for the two separate constrcution contracts using a master projed manual <br />developed for the Projed to supplement the detailed design drawings. Each project manual will include the <br />advertisement, instruction to bidders, supplemental instruction to bidders, general conditions, supplemental <br />general conditions, special conditions, detailed specifications, bid forms, bond requirements, and other <br />supplemental and special contract provisions and affidavits required for the bid packages. <br />c. The detailed design drawings and project manual for each bid and construction package will be submitted to the <br />City Engineer for review and approval. Three copies of the documents will be provided to the City Engineer <br />for review and commenting purposes. <br />d A Permit To Install (PTI) application for the final detailed design drawings and project manual for each bid <br />package will be prepared by Malcolm Pirnie and submitted to the City Engineer for review and transmittal to <br />the Ohio Environmental Protection Agency. Three copies of the documents will be provided to the City <br />Engineer for the PT'Is required for the Project. <br />e. An opinion of probable costs and quantities for construction of the work covered by the detailed design drawings <br />and project manual for each bid package will be prepazed. The engineer's opinion of the construction costs and <br />quantides along with supporting documentation will be submitted to the Client. <br />NODBS.C/djl A-2 <br />1943003