My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-035 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2012
>
2012-035 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 3:49:09 PM
Creation date
12/27/2013 9:03:51 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2012-035
Legislation Date
4/18/2012
Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
??OP? OF ??RVICESNELIVERABLES <br />MOVE FORWARD PHASE : IMPLEMENTATION MANAGEMENT <br />Studio Graphique will work closely with the City of North Olmsted to implement the Gateway Signage as planned <br />for and designed in zoio. Our services include: <br />Draft Phase III Project Timeline. Review Phase II documentation of signage details and locations. <br />> Half-Day implementation kick-off with Client. Meet to discuss specific sign locations and perform <br />location walk- or drive-through to determine & photo-document availability of existing poles and <br />install conditions. <br />> Bid Documentation: Update existing location plans and suppiement with additional location information <br />including specific poles (for use of existing) or footer locations (for new poles). Include bid worksheet <br />with quantities and bidding guidelines. <br />> Support Client in presenting final documentation to Council committee for approval. <br />> Pre-Bid Meeting: Aid Client in holding (i) pre-bid meetings for potential fabricator(s) to ask questions. <br />> Answer RFIs from fabricators during bidding period. Review bid responses; coordinate with Client to <br />select fabricator. <br />> Fabrication kick-off: Meet with selected fabricator to review drawings and locations, establish fabrication <br />schedule and answer questions. <br />> Review shop drawings and material samples from fabricator to confirm that all submitted items comply <br />with Design Intent. <br />> Answer questions during fabrication period. <br />> Perfarm up to one (i) field inspection during installation. <br />> Survey finished project and prepare punch list of installed signs. <br />Deliverablee <br />> Bid Documentation Package <br />> Final Punch Liet <br />PRU???CT Aw??UMPTIONS <br />These are the assumptions we have made about this project that will help to keep costs down. <br />> Rounds of revisions (all phases and services): includes z rounds of revisions/refinement to selected <br />design/document. We ask that comments be collected and provided all together to minimize time spent <br />on multiple rounds of revisions. Additional revisions billed hourly. <br />> Includes up to six (6) in-person meetings, presentations and/or site visits. Studio Graphique may suggest <br />pdf or other online methods of communications when appropriate. <br />RESPONSIBILITY OF FABRICATOR/INSTALLER <br />> Shop Drawings <br />> Engineering <br />> Obtaining sign permits <br />> Coordination with OUPS for utility inspections at installation sites <br />Studio Graphique, Inc. 11406CN0-0312 Gateway Impiementation 1214
The URL can be used to link to this page
Your browser does not support the video tag.