Laserfiche WebLink
(h) Ventilation - Commercial <br />' (1) Installation of new exhaust system for kitchen and cooking space, 50.00 <br />including duct, hood, and filters, each <br />' (2) Replacement of Exhaust Fan <br />(1) Duct or hood ' 40.00 <br />(2) Each additional unit 20.00 <br />'(i) Residential exhaust fans, to include bathroom exhaust 35.00 <br />1321.03 PLUMBING AND SEWER PERMIT FEES. <br />The following fee schedule shall prevail for all plumbing and sewer work to be performed. <br />'(a) This base fee for any plumbing or sewer permit on a new construction and/or <br />! addition, alterations, to which shall be added the following charges for each unit ' <br />installed or altered: ' <br />. _ <br />' (1) Residential <br />. <br />' 40.00 <br />(2) Commercial 60.00 <br /> <br />' (b) Each fixture trap _.----- <br />4.00 <br />'(c) Sump Pump or Ejector 5.00 <br />(d) Water Heater or Storage Tank 10.00 <br />(e) Each 100 Lineal Feet or Fraction thereof Building Drain or Sewer 10.00 <br />(f) Oil Separator 12.00 <br />' (g) Sewage Ejectar ' 12.00 <br />, (h) Lawn Sprinkler System 30.00 <br />' (i) Catch Basin 8.00 <br />' (j) Interceptor (grease) 1,000 gallons 60.00 <br />' (k) Grease Trap 30.00 <br />1321.04 ELECTRICAL PERMIT FEES. <br />The following fee schedule shall prevail for all electrical work to be performed: <br />' (a) Residential, new construction : <br />(1) Under 1500 sq. ft• _ _100.00 <br />(2) Over 1500 sq. ft. _ 125.00 <br />' (b) Residential, additions, or alterations <br />(1) Base fee, plus: 'I 50.00 <br /> <br />! (2) Per outlet and switches -- <br />2.00 <br />' (3) Outlets over 200 volts 10.00 <br />' (4) Power outlets: transformers, generators, batteries (prime and second), <br />rectifiers, electrostatic filters and motors, including controls, distribution <br />' and connections thereto, each: <br />Up to 1 HP 12.00