Laserfiche WebLink
' Over 1 HP, up to 15 HP <br />' Over 15 HP <br />? '(c) Commercial or industrial, new construction or addition <br />' (1) Base fee, plus: <br />' (2) Per outlet and switches <br />(3) Parking lot light fixtures (per pole) <br />(4) Outlets over 200 volts <br />(5) Power outlets: transformers, generators, batteries (prime and second), <br />rectifiers, electrostatic filters and motors, including controls, distribution <br />' and connections thereto, each: <br />' Up to 1 HP <br />Over 1 HP, up to 15 HP <br />' Over 15 HP <br />(6) X-ray machine and equipment, each <br />1321.05 PLANS EXAMINATION FEES. <br />25.00 <br />35.00 <br />' 75.00 <br />2.50 <br />50.00 <br />35.00 _ <br />12.00 <br />25.00 <br />35.00 <br />45.00 <br />For work requiring the examination of plans, the following fee schedule shall prevail: <br />(a) Single family residential; new construction, additions and alterations 90.00 <br />(b) Multiple family residential, commercial and industrial; new construction, <br />' additions and alterations <br />' (1) Base fee 150.00 <br />(2) Plus per 100 sq. ft. 4.00 <br />(c) Review of plans not approved per occurrence +50% <br />(d) Review of nonconforming plans per occurrence +25% <br />;(e) Review of shop drawings (fire alarm, sprinklers, HVAC etc.) not submitted as 120.00 <br />part of the original documents <br />i) rius per i w sq, tt. <br />- __ <br />(f) Review of changes submitted after plans are approved (commercial) <br />1321.06 PERMIT CONDITIONS AND SPECIAL FEES. <br />45.00 <br />(a) Surcharges as required by the State of Ohio will be assessed on all building, <br />HVAC, plumbing and electrical permits as follows: <br />' (1) All commercial permits governed by the Ohio Building Code 3% <br />' (2) All residential permits governed by the Residential Code of Ohio 1% <br />'(b) Permits issued under this fee schedule shall expire as follows: <br />(1) Homeowners permit: 12 months from date of issuance <br />(2) Building Permits: 12 months, provided that work has begun within 6 <br />months of issuance; permit expires if work has not begun within 6 months <br />(3) Mechanical Permits: 12 months, provided that work has begun within 6 <br />months of issuance; permit expires if work has not begun within 6 months