Laserfiche WebLink
July 30,2013 Attachment A Tim <br />Scope of Services - Great Northern Boulevard <br />URS Corporation (URS) shall perform professional traffic and roadway engineering services by <br />providing construction plans and bidding documents to improve the safety along Great Northern <br />Boulevard in the City of North Olmsted, Ohio. This proposal is based on the recommendations <br />set forth in the 2012 Great Northern Boulevard Safety Study completed by the Ohio Department <br />of Transportation (ODOT) and our understanding of your needs as well as ODOT requirements. <br />This proposal inciudes the development of construction plans necessary to implement the <br />recommendations previously set forth in the completed Safety Study. <br />Desiqn Services <br />Kick-Off Meetinq - Prior to commencing work, URS will meet with City of North <br />Olmsted staff to review the scope of work for this project. At this meeting, we will review <br />this scope of work to provide a clear understanding of the elements of the design. <br />2. Data Collection - URS will provide professional surveying services by performing a <br />topographic survey and determination of property lines and rights-of-way along Great <br />Northern Boulevard within the project limits in the areas of widening and median <br />modifications. The topographic survey limits will extend along Great Northern Boulevard <br />from 100' north of the Brookpark Road intersection south along Great Northern <br />Boulevard to the existing I-480 over pass. The survey shall encompass topographic site <br />features within the existing right of way. Existing property lines and rights-of-ways will <br />also be determined within these limits. Coordinate geometry calculations will also be <br />performed in order to verify existing monumentation with record data. Existing centerline <br />limits will be shown on the improvement plans. This scope of services does not include <br />any field staking of the existing right of way. <br />In addition to the field survey, property line determination and centerline establishment, <br />URS will also research and coordinate with all known utility companies with facilities <br />along the corridor, using the same limits as the survey. This information, along with the <br />survey information, will be used to develop basemapping for the project that will be used <br />in detailed design. Three pavement cores/borings are budgeted for this project. <br />3. Staae 1- Preliminarv Desiqn - Once basemapping is developed, URS will prepare a <br />preliminary layout of the improvements developed within the 2012 Great Northern <br />Boulevard Safety Study including roadway widening and resurfacing, concrete median <br />reconfiguration, intersection reconfiguration (I-480 Westbound Entrance ramp and <br />northwest corner of Country Club Boulevard), revised signing and pavement marking <br />and overhead sign and signal mast arm placement. The Stage 1 plans will be drawn in a <br />1"=20' scale and consist of the following elements. <br />a. Title Sheet (1 Sheet) <br />b. Schematic Plan (1 Sheet) <br />c. Typical Sections (3 Sheets) <br />d. General Notes (4 Sheets) <br />e. Plan Sheets (5 Sheets) <br />f. Cross Sections (5 sheets) <br />g. Pavement Elevation Tables (2 Sheets) <br />h. Intersection Details (2 Sheets) <br />i. Signing and Pavement Markings (5 Sheets)