Page 2 of 6 <br />? <br />It is anticipated that cross sections wiii only be developed at locations in areas involving <br />median reconstruction or pavement widening. Cross sections will not be developed <br />along the typical resurfacing section. It is also anticipated that profile views will not be <br />required for this project. In lieu of cross sections and profile views a pavement elevation <br />table will be developed to provide the contractor with elevations required for <br />construction. <br />In addition to the construction plans, an estimate of probable construction costs will also <br />be developed at Stage 1. The estimate will be based on ODOT's Summary of Contracts <br />Awarded and estimated quantities from the plans sheets. <br />The Stage 1 preliminary design plans will be submitted to the City of North Olmsted and <br />ODOT. Additionally, plans will be sent to affected utility companies within the limits of <br />the project for review and coordination. It is anticipated that URS will attend a review <br />meeting with the City and/or ODOT to present the plans and/or discuss review <br />comments. <br />4. Staae 2/3 - Detailed Desian - Upon the completion of the Stage 1 plan review by the <br />City of North Olmsted and ODOT, URS will develop a combined Stage 2/3 detailed <br />design plan set. This plan set will address the Stage 1 comments, complete the <br />engineering design components within the plans and develop refined estimated <br />quantities for the project. The combined Stage 2/3 submittal is recommended for this <br />project since the alternatives presented at Stage 1 have already been recommend by <br />the 2012 Great Northern Boulevard Safety Study and little changes to these <br />recommendations are anticipated, allowing for the design to proceed straight to Stage 3 <br />? completion. The following elements will be included with the Stage 2/3 submittal. <br />a. Title Sheet (1 Sheet) <br />b. Schematic Plan (1 Sheet) <br />c. Typical Sections (3 Sheets) <br />d. General Notes (4 Sheets) <br />e. Maintenance of Traffic Notes and Details (4 Sheets) <br />f. General Summary (3 Sheets) <br />g. Sub summaries and Calculations (5 Sheets) <br />h. Plan Sheets (5 Sheets) <br />i. Cross Sections (5 sheets) <br />j. Pavement Elevation Tables (2 Sheets) <br />k. Intersection Details (2 Sheets) <br />1. Signing and Pavement Marking General Summary (1 Sheet) <br />m.Signing and Pavement Marking Sub summaries and Calculations (1 Sheet) <br />n. Signing and Pavement marking General Notes (1 Sheet) <br />o. Signing and Pavement Markings (5 Sheets) <br />Stage 2/3 plans will be submitted to the City of North Olmsted and ODOT for review and <br />will include final layout and design of the proposed roadway improvements (roadway <br />widening and resurfacing, concrete median reconfiguration, intersection reconfiguration, <br />revised signing and pavement marking and overhead sign and signal mast arm <br />placement). Stage 2/3 plans will also include a plan for maintaining traffic during <br />construction activities. It is anticipated that detailed maintenance of traffic plans will not <br />be developed for this project but phasing/sequencing notes, typical sections and